December 22, 2008 Item No. 7C <br />Page 2 <br />Discussion: <br />Project Development <br />The Streets and Utilities Committee held their first meeting on April 21, 2008. From that <br />date until the present, Staff has worked in coordination with the Committee and the City <br />Council to identify and address issues regarding the overall Street and Utility <br />Improvement Program and the specific 2009-2010 Street and Utility Improvement <br />Project. This included development of the new Stormwater Infiltration Program (SIP), <br />and the holding of two public meetings – the first on June 14, 2008 regarding various <br />design issues of the 2009-2010 Street and Utility Improvement Project, and the second <br />on July 15, 2008 regarding the proposed SIP. <br />The project development activities resulted in a number of resolutions being adopted by <br />the City Council. The following table summarizes these resolutions: <br />Resolution No.Date Description <br />7307 7-28-08 Various Design Issues on the 2009-2010 SUIP <br />7319 8-11-08 Establish components of the Stormwater <br />Improvement Program (SIP) <br />7327 8-25-08 Additional Design Issues on Red Oak Drive and <br />Hillview Road <br />7328 8-25-08 Establish parameters for SIP Appeal Process <br />7336 9-22-08 Traffic Calming on Red Oak Drive <br />7338 9-22-08 Policy for Non-conforming Driveways <br />7348 10-27-08 Red Oak Drive Lane Configuration south of <br />Hillview Road <br />7349 10-27-08 Laport Drive and Edgewood Drive Intersection <br />7352 11-10-08 Consider Appeals to SIP for 2009-2010 Project <br />7359 11-24-08 Sidewalk along Red Oak Drive south of <br />Hillview Road <br />7360 11-24-08 Amending Res. 7307 with regard to parking <br />along Hillview Road and Greenwood Drive <br />Plans and Specifications <br />Plans and specifications for the project have been prepared. The full set of plans is 81 <br />pages long. Two complete sets of plans have been provided to City Staff, and are <br />available at City Hall for review if desired. In the interest of length, only relevant sheets <br />from the plan set have been attached to this Staff Report for City Council review. <br />The plans are in general accordance with the original Feasibility Report for the <br />2007-2008 Street and Utility Improvement Project, including modifications per all <br />subsequent resolutions noted in the previous table. However, there are a few <br />noteworthy modifications to the project that occurred outside of the resolutions listed <br />above during the detailed final design phase of the project plans. A summary of these <br />changes is as follows: