My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2008/12/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2008
>
Agenda Packets - 2008/12/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:47 PM
Creation date
7/10/2018 12:02:56 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/22/2008
Supplemental fields
City Council Document Type
City Council Packets
Date
12/22/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
December 22, 2008 Item No. 7C <br />Page 5 <br />x Hillview Road Storm Sewer: <br />The Design Team from Bonestroo met with the City Public Works Staff on <br />December 10, 2008 to review the final plans. The Public Works Staff had a <br />number of minor detailed comments which have since been incorporated into the <br />plan. However, the Public Works Staff also indicated a history of drainage <br />problems at the intersection of Hillview Road and Fairchild Avenue. After <br />investigation, it was determined to be possible to extend storm sewer along <br />Hillview Road from Red Oak Drive to Fairchild Avenue, to improve the drainage <br />at that location. <br />- This improvement has been included in the final plan, and is shown on <br />plan sheet C5.09 included with this Staff Report. <br />- The estimated construction cost of this storm sewer = $14,100 <br />x Sanitary Sewer and Water Service Lines: <br />The construction plans include provisions for a small amount of work on sanitary <br />sewer and water service lines. The provisions allow for repair or replacement of <br />existing sanitary sewer service lines that may be identified during the course of <br />the work. It also allows for the installation of new sanitary sewer and water <br />service lines in the instance where a potential lot split is identified. <br />It should be noted that there is no utility service work currently planned in the <br />project. These items have been included in the plan so that prices are obtained <br />through the bidding process. This eliminates the need to negotiate prices if this <br />work is encountered during the construction. <br />The sanitary sewer and water services are owned by each individual property <br />owner. Therefore it should also be noted that any utility service work performed <br />would be done at the request of the private property owner, and would also be at <br />their sole expense. There would be no cost to the City for utility service work. <br />The estimated construction cost of the sanitary sewer and water service line work <br />included in the construction project is approximately $37,500. <br />x Silver Lake Woods (Lake Court Drive & Lake Court Circle): <br />The City Council ordered the public improvements and authorized the <br />preparation of plans and specifications for Lake Court Drive and Lake Court <br />Circle under Resolution 7353 on November 10, 2008. The Staff Report for that <br />item had indicated that the most efficient and cost effective way to accomplish <br />the improvements would be to combine them in the construction contract for the <br />2009-2010 Street and Utility Improvement Project.
The URL can be used to link to this page
Your browser does not support the video tag.