<br /> <br /> <br /> <br /> <br />Memorandum <br /> <br />Date: October 24, 2016 <br /> <br />To: Honorable Mayor and City Council <br /> <br />From: Brian Erickson, Director of Public Works/City Engineer <br /> <br />Subject: Public Works Facility Cost Estimate Update <br /> <br />Staff has been working with Oertel Architects on the cost estimate for the new Public Works Facility. At this <br />point, the total cost estimate is $6,972,808. The previous working total project estimate was $7,753,725. This <br />estimate includes the following items: <br />1. Public Works building with offices, vehicle storage, vehicle maintenance, and shop space. <br />2. Attached cold storage building. <br />3. Salt storage shed. <br />4. Fuel tanks and pump area. <br />5. Material storage bins <br />6. Associated site work, landscaping, stormwater management and fencing. <br />7. Demolition of existing buildings. <br />8. Allowances for furniture, public works equipment, geotechnical evaluation, furniture, <br />telecommunications/information technology, special inspections, sewer access charge, system <br />commissioning, and the design fees. <br /> <br />Within this estimate are costs which are estimated based on the construction estimate. Those include design <br />and construction contingency and general requirements of the contract. They were estimated at 10% <br />respectively; however based on recent bids the general requirements was reduced to 5% and the contingency <br />was reduce to 6%. This resulted in estimated costs reductions of $322,000 and $264,000 respectively for a <br />total of $587,000. The contingency will likely drop to 3% at time of contract award, resulting in an additional <br />reduction of $175,000. <br /> <br />We also reviewed additional areas for savings and have incorporated those in the current estimate. These <br />include: <br />• Eliminating one maintenance bay at an estimated savings of $123,000. <br />• Reducing the pavement area and yard space at an estimates savings of $40,000. <br />• Removing the purchase of public works equipment (lifts, crane, wash bay) from the contract and <br />purchasing this equipment from state bid at an estimated savings of $30,000. <br /> <br />The following table lays out the estimates and reductions shown above: <br /> <br />Current <br />Estimate <br />Previous <br />Estimate Cost Reduction <br />Main Building 4,490,767$ 4,805,431$ (314,664)$ <br />Site Work 880,618$ 927,269$ (46,651)$ <br />Auxillary Structures 347,397$ 347,397$ -$ <br />Subtotal 5,718,782$ 6,080,097$ (361,315)$ <br />General Conditions*285,939$ 608,010$ (322,071)$ <br />Contingency **343,127$ 608,010$ (264,883)$ <br />Other Costs/Allowances 624,959$ 457,609$ 167,350$ <br />Total Project Estimate 6,972,807$ 7,753,725$ (780,918)$ <br />* General Conditions at 10% and reduced to 5% <br />** Contingency at 10% and reduced to 6% <br />TOTAL PROJECT ESTIMATE