Laserfiche WebLink
<br />Finally, there is a requirement to relocate the existing water line connecting Well #2 with the Water Treatment <br />Plant. This line runs around the south side of the existing building and would thus be underneath the planned <br />vehicle storage garage. This line would be relocated to the north into the existing boulevard. This results in an <br />estimated cost of $84,000. This cost should be paid from the Water Fund. Whether or not that is paid initially <br />(into the Capital Project Fund) or utilized for Bond repayment is to be established. <br /> <br />Staff continues to review the estimate and is working with the architect to identify additional possible savings. <br /> <br />Respectfully submitted, <br /> <br /> <br />Brian Erickson – Director of Public Works/City Engineer <br />