My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2016/11/07
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
Agenda Packets - 2016/11/07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:58 PM
Creation date
7/10/2018 12:28:15 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/7/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
11/7/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Finally, there is a requirement to relocate the existing water line connecting Well #2 with the Water Treatment <br />Plant. This line runs around the south side of the existing building and would thus be underneath the planned <br />vehicle storage garage. This line would be relocated to the north into the existing boulevard. This results in an <br />estimated cost of $84,000. This cost should be paid from the Water Fund. Whether or not that is paid initially <br />(into the Capital Project Fund) or utilized for Bond repayment is to be established. <br /> <br />Staff continues to review the estimate and is working with the architect to identify additional possible savings. <br /> <br />Respectfully submitted, <br /> <br /> <br />Brian Erickson – Director of Public Works/City Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.