My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2015/01/05 (2)
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2015
>
Agenda Packets - 2015/01/05 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:45:46 PM
Creation date
7/10/2018 12:31:53 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/5/2015
Supplemental fields
City Council Document Type
City Council Packets
Date
1/5/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
December 30, 2014 <br />Assessment Considerations for Mustang Drive Pavement Rehabilitation and Drainage Improvements Projects <br />Page 3 of 5 <br /> <br />Some preliminary engineering design and analysis for the storm drainage improvement <br />options may be necessary for completing the feasibility report. <br />The report will have a detailed cost estimate for the improvements, including amounts to <br />be assessed to each parcel and the methodology used to calculate the proposed <br />assessments. Staff has been directed to provide assessment considerations which <br />are presented here. Other options not shown do remain available. The City shall <br />provide direction with regards to assessments for inclusion in the final Feasibility <br />Report. <br />Assessment Distribution <br />In accordance with Mounds View Code 202.09 Subd 3, three methods of assessments <br />were considered: Area Assessment, Unit Assessment, and Front Footage Assessment. <br />Area Assessment is based on the parcel’s area, derived by dividing the area of each <br />property to be assessed by the total area of properties to be assessed. Unit Assessment is <br />derived by dividing the total project cost by the number of units in the project area. Front <br />Footage Assessment is derived by dividing the property’s front footage along the project <br />area by the total front footage of the project. The three assessment options can be seen <br />below. <br />Option 1 and Option 2 <br /> <br />OPTION 1: <br />Area Assessment <br />OPTION 2: <br />Unit Assessment <br />Address Owner <br />Area <br />(AC) <br />Area <br />Assess per <br />parcel% <br />Area <br />Assess per <br />owner% Unit <br />Unit <br />Assess per <br />parcel% <br />Unit <br />Assess per <br />owner% <br />2151 Mustang Dr Gregory & Jane Kelley 0.97 1.52%1.52%1 8%8.33% <br />2159 Mustang Dr <br />Bauer Welding Metal <br />Fabricators 7.79 12.19%12.19%1 8%8.33% <br />2169 Mustang Dr <br />Midwest Motor <br />Express Inc. 8.15 12.76%12.76%1 8%8.33% <br />4800 Mustang Cir Phillip Javinsky 1.05 1.64%1.64%1 8%8.33% <br />4860 Mustang Cir Fac Holdings LLC 4.63 7.25%7.25%1 8%8.33% <br />4825 Mustang Cir D & A Development Co 4.24 6.64% 1 8% <br />4825 Mustang Cir D & A Development Co 2.95 4.62% 1 8% <br />4825 Mustang Cir D & A Development Co 3.6 5.64%16.89%1 8%25.00% <br />4751 Mustang Cir Fedtech Partners LLC 9.99 15.64% 1 8% <br />4751 Mustang Cir Fedtech Partners LLC 5.89 9.22%24.86%1 8%16.67% <br />2160 Mustang Dr MFJ Company LLP 13.09 20.49%20.49%1 8%8.33% <br />4759 Old Highway 8 GI Technology Inc 1.53 2.40%2.40%1 8%8.33% <br />100.00%100.00%100.00%100.00% <br />
The URL can be used to link to this page
Your browser does not support the video tag.