Laserfiche WebLink
CITY <br />QUANTITY <br />CITY <br />COST <br />COUNTY <br />QUANTITY <br />COUNTY <br />COST <br />CITY <br />QUANTITY <br />CITY <br />COST <br />COUNTY <br />QUANTITY <br />COUNTY <br />COST <br />CITY <br />QUANTITY <br />CITY <br />COST <br />CITY <br />QUANTITY <br />CITY <br />COST <br />COUNTY <br />QUANTITY <br />COUNTY <br />COST <br />NO.ITEM UNIT UNIT <br />PRICE <br />TRAIL SEGMENT 6 TRAIL SEGMENT 11 ALTERNATE 1 - LIGHTING <br />SYSTEM AT EX TRAIL TOTAL <br />PROJECT <br />QUANTITY <br />TOTAL <br />PROJECT <br />COST <br />ALTERNATE 2 - EDGEWOOD DR TRAIL IMPROVEMENTS <br />37 2" NON-METALLIC CONDUIT (DIRECTIONALLY DRILLED)LF $20.00 0.00 $0.00 0.00 $0.00 370.00 7,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 370.00 $7,400.00 <br />38 UNDERGROUND WIRE 1 COND NO 8 LF $0.65 3,340.00 $2,171.00 0.00 $0.00 8,000.00 5,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,340.00 $7,371.00 <br />39 UNDERGROUND WIRE 1 COND NO 6 LF $0.85 1,120.00 $952.00 0.00 $0.00 2,670.00 2,269.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,790.00 $3,221.50 <br />40 UNDERGROUND WIRE 1 COND NO 2 LF $2.20 40.00 $88.00 0.00 $0.00 270.00 594.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 310.00 $682.00 <br />41 HANDHOLE EA $675.00 1.00 $675.00 0.00 $0.00 1.00 675.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 $1,350.00 <br />42 EQUIPMENT PAD B EA $800.00 1.00 $800.00 0.00 $0.00 1.00 800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 $1,600.00 <br />43 SERVICE CABINET TYPE L1 EA $8,000.00 1.00 $8,000.00 0.00 $0.00 1.00 8,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 $16,000.00 <br />44 SILT FENCE, TYPE MACHINE SLICED LF $2.85 170.00 $484.50 0.00 $0.00 400.00 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 570.00 $1,624.50 <br />45 STORM DRAIN INLET PROTECTION PER STANDARD DETAIL ERO-4C EA $300.00 2.00 $600.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 $600.00 <br />46 EROSION CONTROL SUPERVISOR LS $400.00 0.313 $125.20 0.036 $14.40 0.566 226.40 0.085 34.00 0.000 0.00 0.000 0.00 0.000 0.00 1.00 $400.00 <br />47 COMMON TOPSOIL BORROW (LV)CY $25.00 120.00 $3,000.00 0.00 $0.00 270.00 6,750.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 390.00 $9,750.00 <br />48 PLANTING BED PREPARATION LS $440.00 0.50 $220.00 0.00 $0.00 0.50 220.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 $440.00 <br />49 ORNAMENTAL GRASS - 1 GAL EA $30.00 46.00 $1,380.00 0.00 $0.00 81.00 2,430.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 127.00 $3,810.00 <br />50 SHREDDED HARDWOOD MULCH CY $93.50 2.00 $187.00 0.00 $0.00 4.00 374.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 $561.00 <br />51 APPLICATION OF WATER FOR TURF ESTABLISHMENT MG $15.00 20.00 $300.00 0.00 $0.00 40.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 $900.00 <br />52 SEED (MNDOT SEED MIX 25-121) AND HYDROMULCH SY $1.90 3,350.00 $6,365.00 0.00 $0.00 7,500.00 14,250.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,850.00 $20,615.00 <br />53 SEEDING, INCL SEED (MNDOT SEED MIX 25-121), FERTILIZER AND EROSION CONTROL BLANKET SY $3.85 100.00 $385.00 0.00 $0.00 100.00 385.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200.00 $770.00 <br />54 SIGN PANELS, TYPE C SF $100.00 0.00 $0.00 0.00 $0.00 3.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 $300.00 <br />55 CROSSWALK EPOXY SF $4.95 0.00 $0.00 0.00 $0.00 135.00 668.25 135.00 668.25 0.00 0.00 0.00 0.00 0.00 0.00 270.00 $1,336.50 <br />TOTAL BASE BID $148,956.85 $16,954.47 $269,307.05 $40,628.11 $0.00 $0.00 $0.00 $475,846.48 <br />ALTERNATE 1: <br />1 REMOVE BITUMINOUS PAVEMENT SY $5.00 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 120.00 600.00 0.00 0.00 0.00 0.00 120.00 $600.00 <br />2 PATCH BITUMINOUS TRAIL SY $30.39 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 120.00 3,646.80 0.00 0.00 0.00 0.00 120.00 $3,646.80 <br />3 LIGHTING UNIT TYPE SPECIAL 1 EA $2,200.00 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 14.00 30,800.00 0.00 0.00 0.00 0.00 14.00 $30,800.00 <br />4 LIGHTING UNIT TYPE SPECIAL 2 EA $5,200.00 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 3.00 15,600.00 0.00 0.00 0.00 0.00 3.00 $15,600.00 <br />5 LIGHTING FOUNDATION DESIGN E EA $700.00 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 17.00 11,900.00 0.00 0.00 0.00 0.00 17.00 $11,900.00 <br />6 2" NON-METALLIC CONDUIT LF $4.20 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 1,470.00 6,174.00 0.00 0.00 0.00 0.00 1,470.00 $6,174.00 <br />7 2" NON-METALLIC CONDUIT (DIRECTIONALLY DRILLED)LF $20.00 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 120.00 2,400.00 0.00 0.00 0.00 0.00 120.00 $2,400.00 <br />8 UNDERGROUND WIRE 1 COND NO 8 LF $0.65 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 5,240.00 3,406.00 0.00 0.00 0.00 0.00 5,240.00 $3,406.00 <br />9 UNDERGROUND WIRE 1 COND NO 6 LF $0.85 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 1,600.00 1,360.00 0.00 0.00 0.00 0.00 1,600.00 $1,360.00 <br />10 UNDERGROUND WIRE 1 COND NO 2 LF $2.20 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 40.00 88.00 0.00 0.00 0.00 0.00 40.00 $88.00 <br />11 HANDHOLE EA $675.00 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 1.00 675.00 0.00 0.00 0.00 0.00 1.00 $675.00 <br />12 EQUIPMENT PAD B EA $800.00 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 1.00 800.00 0.00 0.00 0.00 0.00 1.00 $800.00 <br />13 SERVICE CABINET TYPE L1 EA $8,000.00 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 1.00 8,000.00 0.00 0.00 0.00 0.00 1.00 $8,000.00 <br />14 SEED (MNDOT SEED MIX 25-121) AND HYDROMULCH SY $4.40 0.00 $0.00 0.00 $0.00 0.00 0.00 0.00 0.00 830.00 3,652.00 0.00 0.00 0.00 0.00 830.00 $3,652.00 <br />TOTAL ALTERNATE 1 $0.00 $0.00 $0.00 $0.00 $89,101.80 $0.00 $0.00 $89,101.80 <br />ALTERNATE 2: <br />Exhibit A