My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2008/11/03
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2008
>
Agenda Packets - 2008/11/03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:53 PM
Creation date
7/10/2018 4:40:15 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/3/2008
Supplemental fields
City Council Document Type
City Council Packets
Date
11/3/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View, Minnesota Project No: 435-08132-0 <br />Red Oak Drive South of Hillview Road (Sidewalk Location)Page 2 <br />Attached Figure 1 shows the proposed sidewalk on the east side of Red Oak Drive. The <br />City standard 6.5-foot wide sidewalk would fit within the right-of-way of Red Oak Drive. <br />Approximately 450 square feet of temporary easement for grading and sloping purposes <br />would be needed at the southwest corner of the property on the east side of Red Oak <br />Drive. We anticipate the costs to acquire this easement could be as much as $900, or <br />$2 per square foot. <br />Since the proposed sidewalk will connect to the future trail along County Road 10 (a <br />separate project scheduled for construction in 2009) and will be in the County Road 10 <br />right-of-way, a Ramsey County permit will be required. We have discussed the proposed <br />improvements with Ramsey County and we do not foresee any problems obtaining a <br />permit from them. <br />The estimated project cost to construct a 6.5-foot wide concrete sidewalk on this <br />segment of Red Oak Drive is approximately $12,900.00, which includes the cost of the <br />temporary easement. <br />OPTIONS <br />Staff recommends a 6.5-foot wide concrete sidewalk be constructed in the boulevard of <br />Red Oak Drive, south of Hillview Road. This will offer a link between the future County <br />Road 10 bituminous trail and the pedestrian/bicycle corridor on Hillview Road and Red <br />Oak Drive. A decision needs to be made on the location of the sidewalk, based on one of <br />the following options: <br />x Construct sidewalk on east side of road <br />x Construct sidewalk on west side of road <br />x Construct sidewalk on both sides of road
The URL can be used to link to this page
Your browser does not support the video tag.