My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/11/01
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/11/01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:49 PM
Creation date
7/17/2018 5:53:46 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/1/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
11/1/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> A comparison of 1994 budgeted Sewer Fund expenses to 1993 expenses is <br /> • presented in the cnart below. Total expenses of the Sewer Fund are expected to <br /> decrease by 11 .73% compared to 1993 expenses. <br /> This decrease is primarily attributable to a decrease in Capital Outlay. In 1993 the <br /> City replaced a truck mounted sewer jet rodder at a cost of approximately $164,989: <br /> City operating costs will increase by 4.78%. <br /> Operations consists of administration, utility billing and collections, collection of <br /> sewage and its transfer from City sewer mains to the interceptor mains of the <br /> MWCC, and the payment of sewage treatment costs to the MWCC. <br /> Personnel Costs represent-2272-4%—of the operating costs-of-the S-ewer Utifity. As <br /> indicated in the chart below 4.46 full time equivalent positions are budgeted for 1994. <br /> This is an increase of 0.05 full time equivalent positions from 1993. The Public <br /> Works Director resigned during 1993 and the position was not filled; the Public <br /> Works Supervisor and the City Planner assumed some of the duties and the <br /> remainder will be contracted for by an engineering consulting firm. As a <br /> consequence of the Planner assuming some of the duties formerly performed by the <br /> Public Works Director, 5% of his salary is being allocated to the Sewer Fund. An <br /> additional maintenance worker is proposed for 1994; costs will be shared equally by <br /> the Sewer, Water, and Storm Water Funds. This employee's duties will include: <br /> installation of valves & meters, location of water & sewer lines for excavation <br /> contractors, water treatment plant operation and maintenance of water & sewer <br /> systems. <br /> SCHEDULE OF FULL & PART-TIME EMPLOYEES <br /> 1992 1993 <br /> • <br /> • <br /> Director of Public Works/City Engineer 0.33 0.33 <br /> Public Works Supervisor 0.33 0.33 <br /> Engineering Aide - 0.50 0.50 - <br /> Receptionist/Clerk 0.38 0.50 <br /> Utility Accountant 0.50 0.50 <br /> Accounting Clerk 0.25 0.25 <br /> Maintenance Workers 2.00 2.00 <br /> Total 4.29 4.41 <br /> Materials and supplies are 2.09% of the operating costs of the Sewer Utility. The <br /> Materials and Supplies Budget for 1994 is 5.02% greater than that of 1993. The <br /> increase is primarily due to an increase in operating supplies as a result of <br /> budgeting more root killer to better maintain sewer mains. <br /> • Contractual Services are 68.13% of the operating costs of the Sewer Utility. • <br /> Budgeted contractual services for 1994 are 0.69% more than the amount budgeted <br /> for 1993. Sewage disposal costs paid to the MWCC are expected to remain the <br /> same in 1994. Other contractual services accounts will remain much the same as in <br /> 1993 overall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.