Laserfiche WebLink
3/92 <br /> 411 <br /> Table 3.5 (Cont. ) <br /> SUBWATERSHED <br /> DESIGNATION PRIORITY CORRECTIVE ACTION <br /> GF-6 Future Ditch improvement on <br /> reach draining into <br /> Judicial Ditch No. 1 <br /> between Lois Drive and <br /> Hillview Road. <br /> 35W-3 Future Sediment Removal <br /> EW-1 High Feasibility study on <br /> optimal wetland manage- <br /> ment and function of the <br /> wetland located between <br /> Old Highway 10 and Silver <br /> Lake Road north of County <br /> Road I. Cost of con- <br /> struction can be born by <br /> the developer of the site. <br /> EW-7 High New outlet pipe from <br /> . wetland to Long Lake <br /> Road storm sewer system. <br /> EW-8 High Construction of a <br /> water quality improve- <br /> ment wetland at Long Lake <br /> Road and Ridge Lane. <br /> The basin was initially <br /> proposed in SEH report <br /> "Edgewood District <br /> Drainage Plan" ( 1988 ) . <br /> Feasibility and Construction <br /> Plans and Specifications <br /> under SEH Job #89271. <br /> EW-8 High Trunk storm sewer from <br /> Silverview Pond to Long <br /> Lake Road and County <br /> Road H2 (part of Long <br /> Lake Road storm sewer) . <br /> EW-10 High Trunk storm sewer from <br /> Long Lake Road and <br /> Ridge Lane to Woodcrest <br /> Drive and Irondale Road <br /> (part of Long Lake Road <br /> • storm sewer) . <br /> 3. 2 - 5 <br />