My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1993/09/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1993
>
Agenda Packets - 1993/09/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:01 PM
Creation date
7/17/2018 6:08:55 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/13/1993
Supplemental fields
City Council Document Type
City Council Packets
Date
9/13/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3/92 <br /> • Table 3.5 (Cont. ) <br /> SUBWATERSHED <br /> DESIGNATION PRIORITY CORRECTIVE ACTION <br /> EW-9 Future Repair, modify, and/ . <br /> or replace wetland <br /> outlet located near <br /> Woodcrest Drive and <br /> Ironwood Road. <br /> EW-10 Future Storm sewer from <br /> Clearview Avenue and <br /> Edgewood Drive to <br /> Clearview Avenue and <br /> Irondale Road. The storm <br /> sewer is required only if <br /> the County Road H2 storm <br /> sewer is constructed from <br /> Old Highway 10 to Long <br /> Lake Road. <br /> SC-2 Low Feasibility report <br /> regarding optimal wet- <br /> • land management and <br /> function of the area <br /> located east of Woodcrest <br /> Drive and Silver Lake <br /> Road. The report should <br /> include a cost estimate, <br /> required sediment pond <br /> size, outlet structure <br /> modifications, land <br /> acquisition needs, <br /> address method of <br /> spreading flow uniformly <br /> across wetland and recre- <br /> ational benefits. <br /> SC-4 Low Feasibility report on <br /> a sediment pond <br /> located south of <br /> Woodlake Drive between <br /> Pleasant View Drive. and <br /> Knollwood Road. The <br /> report should include: <br /> a cost estimate, required <br /> sediment pond size, <br /> outlet structure configura- <br /> tion, and land acquisition <br /> needs. <br /> 3.2 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.