Laserfiche WebLink
all <br />DISPOSITION <br />REQUEST FOR COUNCIL CONSIDERATION <br />. ti DI Cog kv <br />AGENDA SESSION DATE <br />Agenda Section: <br />Report Number: <br />Report Date: <br />Item Description: Mounds View fee schedule changes <br />Administrator's Review/Recommendation: <br />• No comments to supplement this report_ <br />• Comments attached. <br />Explanation/Summary (attach supplement sheets as necessary.) <br />SS 16fMMARYl <br />Restoration fee <br />A fee increase is requested for the restoration charge of a water service. This fee is currently $50.00 <br />which covers the labor for locating the resident's water curb box. shutting off the water and turning <br />it back on. The current amount does not include any administrative costs which include (3) mailing <br />notices (2 of which are certified). book keeping expenses and many times an officer is sent to the <br />house to try and deliver a certified letter that was not accepted by normal mail delivery. The proposed <br />increase is $15.00. making the restoration charge $65.00. <br />Street Opening Permits <br />Staff is requesting/recommending that the City repair all street openings. In the past, utility <br />contractors would estimate the size of an opening and the permit was issued accordingly. A few <br />instances have occurred when the patch is not constructed properly and the City crews, in the end, <br />make additional repairs to the patch. several months later, with no compensation. (This is due to <br />settling, cracking. holding water. etc..) Staff is recommending that the City charge $500.00 to $700.00 <br />to repair the street opening and refund the remaining balance to the contractor. The cost of the repair <br />will include asphalt, labor. equipment costs and an administrative charge. A typical water/sewer <br />opening would cost approximately $350.00. (3 man crew at $23.56 per hour each for I hour = $70.68 <br />plus $100.00 for equipment, plus approximately $20.00 per ton for asphalt which covers 4 inch thick, <br />7 1/2 foot square patch, plus $100.00 administrative charge.) This will ensure a proper repair of the <br />road and greatly minimize future repairs of the same street opening. <br />Only in circumstances when multiple openings occur and an inspector is present during the backfilling <br />and base proportion, will a contractor be allowed to construct installation of the bituminous surface. <br />i <br />Michael Ulrich. Public Works Supervisor <br />RECOMAtEN )ATION: <br />