Laserfiche WebLink
MEMORANDUM <br /> Memo To :Paul Harrington, City Planner <br /> From :Ric Minetor, City Engineer/Director o Public Works <br /> Date :September 16, 1992 <br /> Subject :Tyson Expansion - Modified Proposal <br /> The current expansion of parking area and office for Tyson is a <br /> modification of the previous proposed major expansion which was <br /> never built. The modified proposal meets the necessary storm <br /> water runoff requirement with the modification of the ponding <br /> area as proposed in the report dated September 9, 1992 by Putnam <br /> Consultants. <br /> Rice Creek Watershed District will need to review the modified <br /> proposal and issue permits as appropriate. This can be a contin- <br /> gency of the planning commission approval. The grading plan <br /> indicates that the necessary work on the ponding area is outside <br /> of the City wetland; therefore, no additional wetland permit is <br /> required from the City. <br /> The Surface Water Management charge on this development should be <br /> based on not needing to upgrade the storm sewer impacted by the <br /> runoff. Therefore, in accor• - - - ith Chapter 25 of the Municipal <br /> Code, the SWM charge is : (20% of the normal charge of <br /> $1,966 per acre) . <br /> A 9 7S 4 e•re *3 93cre = 03g3.37 <br />