My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2007/10/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2007
>
Agenda Packets - 2007/10/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:37 PM
Creation date
7/17/2018 3:52:06 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/22/2007
Supplemental fields
City Council Document Type
City Council Packets
Date
10/22/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No. 8E <br />Meeting Date: 2007 <br />Type of Business: CA <br />WK: Work Session; PH: Public Hearing; <br />CA: Consent Agenda; CB: Council Business <br />City Administrator Review _______ <br /> City of Mounds View Staff Report <br /> <br />To: Honorable Mayor and City Council <br />From: Jim Hess, Engineering/IS Technician <br /> <br />Item Title/Subject: Resolution 7180 Awarding a Contract for the <br />Installation of Fiber Optic Cable to Water <br />Treatment Plant No. 1 <br /> <br /> <br /> <br />Background: <br />The water plant has an existing office area that is utilized by the water <br />department staff. There is currently no computer network connection to this office <br />area. The existing computers used at the plant are stand alone systems. Staff <br />has been working with the Roseville IT Department on the best way to get <br />connectivity to the plant to allow access to all City computer network resources. <br />The ability to have email, access to laser fiche documents, such as asbuilts, and <br />to use network applications is needed to help in the daily communication and <br />duties of the W ater Department. <br /> <br /> <br /> <br />Discussion: <br />There is an existing underground conduit between the water tower and the <br />treatment plant that can be utilized. There is also conduit from the water tower to <br />City Hall. This existing conduit is the perfect path to pull a fiber optic line. In <br />addition to the computer network benefits, Staff at the treatment plant will also be <br />able to use IP phones. Other communication systems can also use the fiber <br />cable, such as connectivity to the Water Telemetry system. The fiber will also <br />allow for future communication needs. Installation of the fiber is best performed <br />before the winter season so as to avoid the possibility of water frozen in the <br />existing conduit. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.