My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2006/02/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2006
>
Agenda Packets - 2006/02/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:28 PM
Creation date
7/17/2018 4:53:42 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/13/2006
Supplemental fields
City Council Document Type
City Council Packets
Date
2/13/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A complete quote summary is as follows: <br /> <br />Quoter’s Name Total Quote <br />UHL Company $17,800.00 <br />Pro-Tec Design Inc. $19,838.58 <br />TCH Integrated Access Systems $20,667.00 <br /> <br />The low quote was received from UHL Company in the amount of $17,800.00. <br />All three quotes were for the same access control system. <br /> <br />The Special Projects Fund (Account No. 280-4160-7050) is recommended to <br />fund this installation. <br /> <br />Staff recommends that the City Council approve a contact with UHL Company for <br />installation of a security card reading system at City Hall and the Community <br />Center. <br /> <br /> <br />City Hall Project Adjustments <br />In September of 2005, when the City awarded the construction contract for the <br />City Hall Project, it was stated that with a project of this nature, it is inevitable that <br />there will need to be minor adjustments to the scope of the project. These <br />adjustments are a necessary way to ensure that this project is completed in a <br />timely manner and that the City gets the maximum benefit from this project. <br /> <br />Attached is a list of these adjustments that are recommended by Staff and the <br />City’s consultant and are being considered at this time. These adjustments are <br />referred to as Architectural Supplemental Information (ASI’s). These are common <br />in all architectural projects and are even more prevalent in re-model projects. <br />Many of these items are simple adjustments that do not requite additional work <br />from the contractor. These are noted as “NC” – no charge. Other adjustments are <br />listed as “pricing” which means the contractor will be providing a cost to the City <br />to perform this extra work or provide additional materials. <br /> <br />There are three items that we currently have prices for: <br /> <br />ASI-17 is for all the electrical changes throughout the entire building. Most of the <br />items in this adjustment are a result of additional changes in the audio/visual <br />system that will be included in the Council chambers. At the time the plans were <br />completed, an exact audio/visual plan was not available. The portion of the costs <br />of this adjustment that are associated with the audio/visual system can be <br />assigned to the Cable TV Account. <br /> <br />ASI-25 is for disposal of the lighting ballasts. At the time the plans were <br />completed the City indicated that we would retain some lighting fixtures. The <br />exact amount was not known. <br />
The URL can be used to link to this page
Your browser does not support the video tag.