Laserfiche WebLink
• <br /> The future direction of the street program needs to be planned in <br /> a careful and thoughtful manner. Preventive maintenance should be <br /> a corner stone of the program. Funding mechanisms are a necessary <br /> ingredient and need to be determined prior to establishing a <br /> program. <br /> Staff will need to do additional research and provide additional <br /> reports as a part of establishing a long term program. Standards <br /> of rehabilitation or reconstruction will be needed. A planned <br /> multi-year program will provide the least cost to the resident, <br /> but will be dependent on the funding levels available; if <br /> insufficient funds are available, the long term cost is likely to <br /> be higher. <br /> • <br /> 5 <br />