My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2006/05/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2006
>
Agenda Packets - 2006/05/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:03 PM
Creation date
7/18/2018 4:32:48 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/22/2006
Supplemental fields
City Council Document Type
City Council Packets
Date
5/22/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
There are several ASI items for which we currently have prices/credits and their <br />associated Change Orders have been submitted: <br /> <br /> <br />Change Order No. 20 <br />ASI-35: in the credited amount of $633.00. This ASI represents the deletion of <br />nine (9) fire dampers from the project. These dampers are not needed as per <br />current fire code. <br /> <br />Change Order No. 21 <br />ASI-NA: in the amount of $2,744.00. This is for various electrical changes. <br />Change Order No. 26 deletes this change order in its entirety. <br /> <br />Change Order No. 22 <br />ASI-NA: in the amount of $1,602.00. This ASI represents the cost to remove the <br />existing fire alarm infrastructure. The system is longer required by code. <br />However, the existing fire alarm panel was re-used. The panel now serves as the <br />monitor / recall panel for the elevator. A credit to the construction cost will be <br />forthcoming, as a new panel was specified for this function. <br /> <br />Change Order No. 23 <br />ASI-NA: in the amount of $518.00. This ASI represents the cost to paint the <br />ceilings in rooms 002 and 008 and is related to previous Change Order No. 4. - a <br />credit back to the City in the amount of $1,193.00 for the deletion of ACP and <br />gypsum board bulkheads in the basement. <br /> <br />Change Order No. 24 <br />ASI-NA: in the amount of $568.00. This ASI represents the cost of the glazing in <br />the doors that were ordered as part of Change Order No. 11. Change Order No. <br />11 added twelve (12) doors. However, that change order did not include the cost <br />of the additional glazing. <br /> <br />Change Order No. 25 <br />ASI-21: in the amount of $880.00. This ASI represents the cost to modify the <br />existing wall in Unisex 152 in order to accommodate the wall hung toilet fixture. <br /> <br />Change Order No. 26 <br />ASI-NA: in the amount of $347.00. This ASI represents the deletion of Change <br />Order No. 21 in its entirety. This change order only includes a cost for additional <br />work to move the fire alarm panel back to its original location as requested by the <br />fire marshal. <br /> <br /> <br />City Hall Rehabilitation Project Budget <br />The Special Projects Fund, as per the 2005 budget (Account No. 280-4160- <br />7050), has $1,600,000 budgeted for the City Hall Rehabilitation Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.