Laserfiche WebLink
Mounds View City Council June 12, 2006 <br />Regular Meeting Page 22 <br /> <br /> 1 <br />Acting Mayor Stigney stated that he believes the architect, designer, or whomever made the 2 <br />mistake should come back and fix it themselves. Councilmember Gunn replied that the Change 3 <br />Orders refer to other things. Acting Mayor Stigney said that, as he said before, there needs to be 4 <br />an ending point and that the architect should fix things at their cost. 5 <br /> 6 <br />Councilmember Gunn asked if Acting Mayor Stigney will vote no on all of them, for example 7 <br />the fire extinguisher. Acting Mayor Stigney replied that with they way they are presented, he 8 <br />would vote against them unless someone wants to separate them out. Acting Mayor Stigney said 9 <br />he did not vote for the last batch of changes either. 10 <br /> 11 <br />Councilmember Gunn stated her support to postpone action until the next Council meeting 12 <br />because she believes they need to be brought before a full Council. 13 <br /> 14 <br />Acting Mayor Stigney asked if they need three affirmative votes to pass, and Administrator 15 <br />Ulrich said yes. 16 <br /> 17 <br />Councilmember Flaherty WITHDREW MOTION to approve and Councilmember Gunn 18 <br />withdrew her second. 19 <br /> 20 <br />MOTION/SECOND: FLAHERTY/STIGNEY. To postpone consideration of Resolution 6845, 21 <br />A Resolution Approving Change Orders No. 27 through 30 for the City Hall Rehabilitation 22 <br />Project until next Council meeting. 23 <br /> 24 <br />Ayes – 3 Nays – 0 Motion carried. 25 <br /> 26 <br />Q. Resolution 6847 Approving Change Order No. 1 for the Random Park 27 <br />Building Replacement Project 28 <br /> 29 <br />Public Works Director Lee said that on May 22nd, Staff presented a proposal to add a sprinkler to 30 <br />Random Park building. He stated that Change Order No. 1 includes the sprinkler system itself, a 31 <br />4-inch water system to support the sprinkler system itself, and a one-inch domestic water service 32 <br />line. 33 <br /> 34 <br />Public Works Director Lee stated the quote is now $52,322.55 which is about $8,980 more than 35 <br />was quoted on May 22nd. He stated the original quote did not include restoration of Long Lake 36 <br />Road or traffic control entering the park and making the connection to the 12 inch main on Long 37 <br />Lake Road. 38 <br /> 39 <br />Public Works Director Lee said the quote did not include a post-indicator valve which is located 40 <br />on outside of building nor a one-inch service line and the current 3/4-inch. He said it did not 41 <br />include 1”service line, and that that current 3/4” –inch line would not accommodate the current 42 <br />toilets. He said it makes sense to put in 1’ service line. He explained that the original $4,000 fee 43 <br />was negotiated down to $2,500. He stated staff is recommending approval. 44 <br /> 45