My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2006/07/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2006
>
Agenda Packets - 2006/07/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:09 PM
Creation date
7/18/2018 5:07:58 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/24/2006
Supplemental fields
City Council Document Type
City Council Packets
Date
7/24/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council July 10, 2006 <br />Regular Meeting Page 28 <br /> <br />F. Resolution 6874 Approving a Letter Agreement with the firm of Bonestroo, 1 <br />Rosene, Anderlik, and Associates to Assist the City with a Traffic Study of 2 <br />the Northwest Area of the City 3 <br /> 4 <br />Councilmember Thomas stated she pulled the item for notice and that it is an issue that should be 5 <br />discussed. 6 <br /> 7 <br />Mayor Marty stated one of the reasons he wanted to pull the issue is because it is an estimated 8 <br />cost of $43,000 and that he thinks the cost is high. He stated the traffic study does not require an 9 <br />RFP, but he would like to put out an RFP. He stated he would like a study that comes in at 10 <br />$20,000 or less and more money could be used for street repair. 11 <br /> 12 <br />Consulting Engineer Rhein responded that it was an expensive traffic study and the firm listened 13 <br />to the State and concerns of citizens to review the goals of what the study will accomplish. 14 <br /> 15 <br />Consulting Engineer Rhein stated that Staff gained an understanding of what it will take to 16 <br />determine what the City and citizens want. He stated that a lot of the cost is data collection that 17 <br />involves complex calculations and counts at an integrated level. He stated the City does not have 18 <br />the equipment to do the counts and they would have to be subcontracted. 19 <br /> 20 <br />Consulting Engineer Rhein stated the counts themselves would be about $12,000. He stated the 21 <br />City’s scope of services to do other data collection is about $31,000. He stated Public Works 22 <br />Director Lee indicated that the scope of the study would continue to grow and the department 23 <br />would be overrun with hourly work. 24 <br /> 25 <br />Consulting Engineer Rhein stated that Staff put together a detailed list of tasks and identified ten 26 <br />staff members who would be working the report. He stated that he wanted to ensure the 27 <br />implications on state aid are considered. They put together a detailed task list with dollar 28 <br />amounts and put together the study that would meet the needs. He stated this is a cap to what the 29 <br />study will cost and that no more could be spent without Council approval. 30 <br /> 31 <br />Consulting Engineer Rhein explained how costs could be trimmed back throughout the study. 32 <br />He stated that in Section 4.5B, Council could reduce the scope of the study. 33 <br /> 34 <br />Consulting Engineer Rhein stated the Council is welcome to bid for an RFP but he believes 15% 35 <br />lower would be the “bare bones” that could answer the questions requested by the Council. He 36 <br />stated that Director Lee would like to combine this study with the feasibility study. He stated the 37 <br />scheduling on page 5 indicates an immediate start date with a draft study done in eight weeks, 38 <br />which is an aggressive schedule. He noted that the report for the street and utility project could 39 <br />be done by November 1st. 40 <br /> 41 <br />Consulting Engineer Rhein stated if there is an RFP, it will throw off the schedule drastically. 42 <br />He stated that he did not include extra costs. He stated they included the number that gives the 43 <br />City the level of detail needed to answer the questions. 44 <br /> 45
The URL can be used to link to this page
Your browser does not support the video tag.