Laserfiche WebLink
AUG 7 ' 90 7: 43 FROM ARCHITECTURAL ALL I HNC PHGE . 0O ' <br /> 110 <br /> If this space Is used for a large Lobby/Waiting,area it does provide open access to all departments <br /> but it would be substantially larger than public traffic into City Hall would necess tate. Staff <br /> Restrooms,Storage,and the City Hall Receptionist could be located in this space. They would be <br /> arranged so as to provide a screened Waiting Area for the Police Department.Option B would <br /> have no separate entrance for the Police Department <br /> Following is a tabulation of the related costs for Option B. the gross square footage figures used <br /> in determining costs are derived from the drawings of Option B included in this study. These <br /> numbers do not exactly represent the figures that are listed in the proceed s ce need <br /> tabulations recorded in Section t?which are net square footages. <br /> • <br /> • <br /> S <br /> E-2 <br />