Laserfiche WebLink
AUG ' SQ 7: 45 FROM ARCHITECTURAL ILL I ANC <br /> FlGr . u i 0 <br /> • <br /> • <br /> F. RECOMMENDATION <br /> • <br /> Following is an outline of Pros and Cons for Option B and Option C(Option A„a staand-alone <br /> Police Facility having been discarded). This outline was use-,c1 in determining the Architect's <br /> recommendation. <br /> The outline is as follows: <br /> OPTION B <br /> Pros <br /> A large,central Waiting/Reception Area Is created. <br /> A Council Chamber(new)increased in size. <br /> Cons <br /> The Waiting/Receptiorn Area may be too large. <br /> Even with the addition of Staff toilets and a Reception Center,there would be ample <br /> space to seat 20 people. <br /> • The area would not function well(acoustically or functionally)as a meeting space. <br /> Staff would be required to rearrange furniture if meetings are scheduled. Storage <br /> would be required for furniture not in use. <br /> The Community Room would remain in the Basement and would be unenhanced except <br /> cosmetically(new finishes and lights). <br /> There would be no 24-hour entrance to the Police Department <br /> One Police Department Inspector's Office would not have the possibility for an outside <br /> window. <br /> The Council Chamber is accessed by the public only from the outside(staff acct would be <br /> provided internally through a shared Conference Room in the Parks,Recreation,and <br /> Forestry/Public Works area.) <br /> Construction sequencing would be less flyable and the constriction scope would be more <br /> disruptive. <br /> • <br /> F1 <br />