Laserfiche WebLink
RAMSEY COUNTY BOARD OF HEALTH <br /> PUBLIC HEALTH DEPARTMENT Hal Norgard, Chairman <br /> DIVISION OF SOLID WASTE Diane Ahrens <br /> • John T. Finley <br /> Elk 1910 West County Rd. B #206 Ruby Hunt <br /> Duane McCarty <br /> Roseville, MN 55113 Donald E. Salverda <br /> 633-0316 298-5972 ��226 2lZ��y44 Warren W. Schaber <br /> RAMSEY COUNTY Zack Hansen,Manager ti <br /> I 4: <br /> qa4t4iWCW <br /> June 27 , 1990 <br /> Mr . Dor. Pauley • tO\ <br /> City of Mounds View <br /> 2401 Highway 10 <br /> Mounds View, MN 55112 <br /> RE : Site Maintenance at Mounds View Yard Waste Site <br /> Dear Mr . Pauley: <br /> The State prohibition on mixing yard waste with other garbage has <br /> resulted in the extensive use of community yard waste sites in Ramsey <br /> County. The site in Mounds View is no exception, as more residents <br /> than ever have used the site to dispose of leaves and grass . This <br /> increased use has led to site maintenance problems , which is why I am <br /> 411riting to you. <br /> The site is currently in a condition that is close to unusable . The <br /> site has developed a severe problem with water , as there is virtually <br /> no drainage pattern . This has caused water to pond in several places <br /> to a depth of about one foot , and has made the remainder of the site <br /> very muddy. This combination has left only small areas available to <br /> dump yard waste, so that residents dump their grass clippings at <br /> scattered areas on the site . This condition will likely create an' <br /> odor problem if it is not addressed. <br /> In addition to problems with the site surface, the fence surrounding <br /> the site is in disrepair ; in some spots there are openings allowing <br /> peop-le to dump yard waste on the site when the site is closed . <br /> These items should be corrected in order for this site to continue to <br /> function as intended. the Department has prepared a work plan to <br /> repair the surface and the fence, which will resolve the security and <br /> drainage issues . The work would include hauling a significant portion <br /> of the yard waste currently on site to another location , grading the <br /> west half of the site, building a base of gravel and crushed asphalt <br /> on the west half of the site, and repairing/replacing the fence . We <br /> estimate that this will cost about $14 , 000 . We would plan to add a <br /> base of gravel an crushed asphalt to the east half of the site in <br /> 41991 , to complete the reconstruction. The Department would pay for <br /> he cost of construction. <br /> Printed on recycled paper <br />