Laserfiche WebLink
<br /> Discussion: <br />Staff will provide a general overview of the grading and landscape proposal at <br />the work session. <br /> <br />Project Outline: <br /> <br />Grading <br /> Award a contract for grading around the building <br /> <br /> Review existing plant material with the Parks Supervisor and City Forester <br />and determine what, if any, plant material should be salvaged – either <br />reused at City Hall or other City owned property. <br /> <br /> City crews to salvage (pot and remove) specified plant material <br /> <br /> City crews to salvage edging material (landscape blocks) <br /> <br /> City crews to remove irrigation system that can be salvaged (mainly just <br />the sprinkler head will be salvaged) <br /> <br /> Gopher State One utility locates are completed <br /> <br /> Grading contractor grades around the building – creating a positive grade <br /> <br /> <br />Landscape <br /> Staff contacts several landscape contractors and discusses process for <br />development of a landscape plan and plant material / landscape supplies <br />purchase <br /> <br /> Authorize development of a landscape plan <br /> <br /> Landscape plan developed / reviewed / approved <br /> <br /> Award a contract for purchase of plant material / landscape supplies <br /> <br /> Award a contract for re-installation of irrigation pipe and irrigation sprinkler <br />heads <br /> <br /> <br />Landscape Installation <br /> Eagle Scout Project <br />o Install plant material <br />o Install edging <br />o Install weed barrier fabric <br />o Install rock mulch – PW/Parks to assist with skid loader <br />o Install sod - PW/Parks to assist with skid loader