Laserfiche WebLink
Mr. Paul Harrington December 5, 1991 Page 2 <br /> 41111 <br /> ■ Language demonstrating that the proposed size of development evelopment is the <br /> minimum necessary. <br /> ■ A construction schedule. <br /> • Soil loss computations for construction and post-construction <br /> conditions using the ordinance specified method. <br /> • A plan and design specifications for all sediment and erosion control <br /> measures. <br /> The results from the preliminary review also indicate that Lots 2 and 3 of <br /> Block 4 and Lot 2 of Block 3 are not in compliance with the minimum lot width and <br /> lot size standards. • <br /> If you have any questions regarding this matter, please call. <br /> Sncerely, <br /> Peter J. Sabee <br /> PJS:ymh <br /> • 23\62\156\PH.LTR <br /> • <br /> • <br />