My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-02-1994
MoundsView
>
City Commissions
>
Planning & Zoning
>
Packets
>
1990-1999
>
1994
>
03-02-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 5:53:23 AM
Creation date
7/31/2018 5:53:18 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
3/2/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The building will include approximately 4, 000 square feet (14%) <br /> of finished office area with the balance of the building devoted <br /> to production, shop, storage and distribution space. The <br /> building exterior will be constructed of concrete masonry block, <br /> with painted surface, with decorative "rock face" block and an <br /> accent band of single scored block on the building front, with <br /> smooth-faced block on the remainderof the building. The front <br /> of the building will include a glazed store-front type entry with <br /> anodized aluminum framing, and matching windows in the <br /> southwestern portion of the building where the offices will be <br /> located. The building height will be approximately 20 feet. <br /> LAND ALLOCATION AND COVERAGE CALCULATION <br /> SITE AREA: 2 . 64 acres (114, 955 square feet) <br /> BUILDING AREA: 29, 568 square feet <br /> BUILDING TO LAND <br /> COVERAGE: 25. 7% <br /> PARKING AND DRIVE <br /> AREAS (35%) : 40, 247 square feet <br /> • TOTAL HARD SURFACED <br /> AREA OF SITE (61%) : 69, 815 square feet <br /> OPEN SPACE AND <br /> GREEN AREA (39%) : 45, 129 square feet <br /> CONSTRUCTION SCHEDULE <br /> The Hill project is proposed for construction commencing on or <br /> about June 1, 1994, as soon as necessary project approvals can be <br /> obtained, with completion by December 31, 1994 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.