Laserfiche WebLink
<br />RLK Letter <br />May 19, 2005 <br />Page 3 <br /> <br />Right-of-Way <br />Comment: <br />Mn/DOT is working on the property rights, transfer, appraisal, and other items. If you <br />have any questions about these, please contact Keith McMurray, Mn/DOT Metro District <br />Right of Way Office, at 651-582-1635. <br /> <br />Response: <br />Comment noted. <br /> <br /> <br />Design <br />Comment: <br />It should also be noted that there is a high likelihood of a future need for major expansions <br />of TH 10 and Interstate Highway 35W in this vicinity. Developments such as The Bridges <br />will only increase the need for expansion. In view of that likelihood, the proposed location <br />of buildings within the development immediately adjacent to the TH 10 north right of way <br />line would preclude or severely hamper future expansion of the TH 10/I-35W system <br />interchange. To provide maximum flexibility for a future footprint for an expanded TH 10/I- <br />35W system interchange, we encourage the developer to consider placing any buildings <br />much further north in the development. Land uses in the portion of the development <br />adjacent to the TH 10-I-35W system interchange that will be more compatible with the need <br />for future highway expansion in this area include green space, surface parking, or ponding. <br /> For more information on these points, please contact Richard Scarrow, Mn/DOT Metro <br />District Design, at 651-582-1333. <br /> <br />Response: <br />Comment noted. Please see highlights of the original response to this comment from <br />the first comment period reiterated below: <br /> <br />“The request to consider building placement further to the north is noted. The site plans <br />included in the AUAR are schematic in nature, and were prepared in order to identify the <br />massing and relative size of the “built” environment and associated potential environmental <br />impacts. The final site development plans will ultimately be the responsibility of the <br />developer. The site plan development will be in accordance with the current highway <br />setback requirements for buildings…The City of Mounds View will review the site plan with <br />consideration for the future improvements and expansion of TH 10.” <br /> <br /> <br />Permits <br />Comment: <br />Any use of or work within or affecting Mn/DOT right of way requires a permit. Permit forms <br />are available from Mn/DOT’s utility website at www.dot.state.mn.us/tecsup/utility. Please <br />direct any questions regarding permit requirements to Keith Van Wagner (651-582-1443), <br />or Buck Craig (651-582-1447) of Mn/DOT’s Metro Permits Section. <br /> <br />Response: <br />Comment noted. <br /> <br />