My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-04-1996
MoundsView
>
City Commissions
>
Planning & Zoning
>
Packets
>
1990-1999
>
1996
>
09-04-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 3:20:53 PM
Creation date
7/31/2018 2:08:12 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
9/4/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mounds View Planning Commission August 7, 1996 <br /> Regular Meeting Page 4 <br /> be as great as portrayed in the City's analysis. <br /> She also explained that a retention area may <br /> not be required because they have an <br /> alternative proposal to use a clarification ditch <br /> and that our Engineering consultant is awaiting <br /> a proposal from Stahl Construction as to how <br /> they will modify the parking lot to make this <br /> proposal work. Director Sheldon recommended <br /> to the Planning Commission that this item be <br /> tabled at this point but noted that the applicant <br /> is requesting that the Planning Commission act <br /> on the variance so that the lay-out of the site <br /> can be arranged. <br /> The Planning Commission inquired about the <br /> curb cuts that are not in compliance. Planning <br /> Associate Pruitt informed the Commission that <br /> the applicant desires to remedy this issue and • <br /> come into compliance with City Code. Planning <br /> Associate Pruitt also noted items that need to <br /> be addressed: landscaping, fire suppression <br /> system, driveway access, exits on both sides of <br /> the building, revised floor plans showing one <br /> story not two, revised drainage plans for <br /> approval by the City Engineer and submittal of <br /> an application for a wetland alteration permit. <br /> The applicant, Bill Diem, explained that he is in <br /> favor of temporarily tabling this item due to the <br /> fact that the main office for Stahl Construction <br /> is located in Pennsylvania and that it may take <br /> some additional time to get all the items <br /> required. <br /> Lyle Bellis, 2977 County Road H, inquired <br /> whether or not the proposed building would be <br /> a multi-person residence. Mr. Diem responded <br /> that there would be no residence on site. Mr. <br /> Bellis also asked if a traffic study had been <br /> done because he felt this proposal would . <br /> increase traffic flow. Mr. Diem indicated that <br />
The URL can be used to link to this page
Your browser does not support the video tag.