Laserfiche WebLink
Planning Commission <br /> Planning Case No. SP-001-96:Wireless Telecommunications Towers and Antennae <br /> • November 27, 1996 <br /> Page 3 <br /> 6. Setbacks: Towers must be located away from all property lines and public right of ways a <br /> distance equal to the height of the tower plus five feet. <br /> 7. Towers must be located in the rear yard if it is an accessory to a principal structure. <br /> 8. Proposed code does not require siting on City-owned properties. <br /> 9. Antenna tower shall not be.lighted (except as may be required by FAA). <br /> 10. Antenna tower shall not display any signs or advertising. <br /> 11. The tower and antenna shall be painted a neutral color, such as grey-tones or light blue. <br /> 12. Monopoles are required unless, at its discretion, the City Council decides otherwise. <br /> 13. Accessory buildings are permitted. <br /> 14. Accessory buildings shall match or be compatible with the architecture, style and <br /> appearance of the principal or surrounding structures. <br /> • 15. Landscaping is required to the satisfaction of the Planning Commission and City Council. <br /> An eight foot fence is required to surround the tower and accessory building. <br /> 16. Height limits vary by zone. See#3 above for heights provision. <br /> 17. A twenty foot bonus is given to encourage co-location in all districts but R-1 and R-2. <br /> 18. Non-conforming existing towers shall be allowed to continue, but cannot be replaced or <br /> structurally altered without meeting the provisions of this ordinance, unless repair or <br /> replacement is a result of damage to tower. (See Section 1123.07 of the City Code <br /> relating to non-conforming buildings, structures and uses.) <br /> 19. Owners of towers in violation of this code can be charged with a misdemeanor; citations <br /> can be issued. <br /> 20. Tower owners are required to remove obsolete or unused towers within one year. <br /> 21. The applicant shall provide proof that the tower will not disrupt or interfere with other <br /> wireless communications. <br /> • 22. Applicants are required to provide proof of need and an inability to use existing towers or <br /> structures before a new tower proposal will be approved. <br />