My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-18-1997
MoundsView
>
City Commissions
>
Planning & Zoning
>
Packets
>
1990-1999
>
1997
>
06-18-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 5:21:24 AM
Creation date
8/1/2018 5:13:27 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
6/18/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/11/97 WED 14:25 FAX 612 490 2150 SEH ..-r-► HOUNDS VIEW 11002 <br /> • <br /> , rai <br /> Aim ► MEMORANDUM <br /> •ST.PAUL.MN 0 MINNEAPOLIA AIN D ST.CLOUg MN O C1 IPPEWA ALLA Al D MADISON,WI p LAKE COUNTY,IN <br /> TO: Pamela Sheldon,Mounds View Community Development Director <br /> FROM: Rocky Keehn,P.E. <br /> DATE: June 11, 1997 <br /> RE: Review of Silver Lake Common,Planning Case 487-97 <br /> SEH has reviewed the site survey and the proposed building locations for the above referenced project <br /> as requested. Based on the information provided to us on June 10, 1997, we recommend that the <br /> following issues be discussed in greater detail prior to final approval: <br /> ► Drainage of the property north of the site. <br /> ► Impacts of drainage from Eastwood Road. • <br /> The following items also will need to be provided to SEH prior to a finalizing our review: <br /> • A site grading planning with proposed elevations that show how the surface water runoff gets to <br /> the pond. <br /> ► A grading plan of the pond showing side slopes and pipe inverts. <br /> ► Hydrologic calculations that indicate the expected highwater elevations in the pond for the 1 and <br /> 100 year storm events. <br /> Drainage of the property north of the site <br /> Based on the elevations shown on the submitted survey and city contour map, a low area exist just <br /> north of the proposed site. The outflow elevation,based on the developers survey,is 910.9 feet. It <br /> appears the proposed plan blocks the drainage by placing a building over the natural overflow from <br /> this low area. The developer needs to show how they intend to maintain a 910.9 overflow elevation <br /> with aimilinr discharge capacity to prevent femme flooding of the areas north of the site. <br /> Impacts of drainage from Eastwood Road. <br /> A bituminous swale presently drains runoff from Eastwood Road to the Highway 10 ditch. The swale <br /> is located on the developers property. The proposed plan locates a pond over the swale and thus may 4111 <br /> require a change of the existing drainage outlet from Eastwood Road. Since this is a public road <br /> which discharges runoff over private property, the City should determine the best way to drain <br /> Eastwood Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.