My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-1997
MoundsView
>
Commissions
>
Economic Development Commission (Disbanded)
>
Agenda Packets
>
1990-1999
>
1997
>
03-27-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 12:42:26 PM
Creation date
8/1/2018 6:55:59 AM
Metadata
Fields
Template:
MV EDC
EDC Document Type
Packets
Date
3/27/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Property: Jones, Duchesneau, Demeules, Emmel (located south and east of Win Insurance) <br /> Input received at a variety of forums and meetings indicated that senior housing is successful in <br /> the area at Silver Lake Point Apartments and that more is not only appropriate but is needed <br /> • within Section 9. The Preferred Alternative recommends the siting of a higher-density senior <br /> residential facility just to the northwest of the wetland. Silver Lake Road would be accessible by <br /> an access drive dedicated to this residential use, as a through connection to TH 10 would <br /> encourage cut-through traffic, thereby detracting from the residential setting. <br /> This development would benefit from surrounding commercial developments as well as from the <br /> proximity of the public parkland across County Road I and the walking trails around and <br /> extending beyond the wetland area. The wetland itself serves this residential community as an <br /> amenity, and the building should be designed to maximize views of and exposure to the wetland. <br /> Commercial <br /> Property: Western Bank <br /> It appears that there is adequate room in the northwest corner of the Western Bank site on which <br /> to construct a professional office building of some 2,000 to 3,000 square feet as bank officials <br /> have indicated they may wish to pursue. From a land use standpoint, such a use would not be <br /> inappropriate for the site and would create a better sense of scale for this property. The size, <br /> configuration and location for the office structure is largely dependent upon platting. parking, and <br /> setback arrangements to be addressed with the Community Development Department at the time <br /> permit application. <br /> • The location contemplated on the Preferred Alternative graphic suggests that several mature trees <br /> may have to be removed to accommodate such a structure. The existing trees serve to create a <br /> park-like setting within this corner of the bank property and also serve to create a buffer between <br /> residential properties and the bank. The City and land owner should work together to incorporate <br /> as many of these mature trees as possible into the site design for the new structure if it is found <br /> that the trees do not significantly compromise the site's development potential. <br /> Property: Win Insurance, Jones, Duchesneau, Demeules, Emmel (located south and east of Win <br /> Insurance) <br /> The properties at the southeast corner of TH 10 and Silver Lake Road, one the site of Win <br /> Insurance and the other vacant, are identified together in the market overview by Towle Real <br /> Estate as a prime site for convenience commercial or other uses that would rely upon exposure <br /> and ready access to TH 10. This corner is not a destination corner but represents an opportunity <br /> to establish a highway oriented use that offers goods and services to the motoring public. In light <br /> of Towle's recommendation and in consideration of zoning patterns along TH 10. it is <br /> recommended that this property be rezoned to accommodate such a use. <br /> As an alternative, the corner lots can be incorporated into a Planned Unit Development (PUD) <br /> that would encompass all properties within Section 9 that lie north and west of the wetland. The <br /> • intent here would be to minimize the segregation of sites into distinct building pads with distinct <br /> and separate traffic circulation systems, landscaping and architectural character. It is importani. <br /> that this greatest of all opportunities within Section 9 be optimized and that steps be taken to <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.