My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-1997
MoundsView
>
Commissions
>
Economic Development Commission (Disbanded)
>
Agenda Packets
>
1990-1999
>
1997
>
03-27-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 12:42:26 PM
Creation date
8/1/2018 6:55:59 AM
Metadata
Fields
Template:
MV EDC
EDC Document Type
Packets
Date
3/27/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
work cooperatively to establish a development that reflects a heightened image for the corridor. <br /> Architectural standards will play an important role on this site, and the PUD approach, as <br /> intended, would provide the City with reasonable control over site design while affording the <br /> developers an enhanced level of flexibility. <br /> Two office buildings are indicated on the Preferred Alternative—one along Silver Lake Road and <br /> another along TH 10 just west of the offices of TJB contractors. A professional office use is <br /> recommended along Silver Lake Road in order to limit the commercial to the TH 10 frontage and <br /> to serve as a transition between those intense commercial uses and the residential uses to the <br /> south and west. Here again, the entire subarea could benefit from the carefully planned <br /> unification of this office site with the commercial corner and professional office along TH 10. <br /> The concern would be to not encourage cut-through traffic between Silver Lake Road and TH 10. <br /> Access to TH 10 is the primary issue for the professional office building contemplated for that <br /> frontage. A new access drive will not be available for this use, and it will have to rely upon a <br /> shared driveway configuration. The Preferred Alternative suggests a shared access with TJB <br /> contractors. Additionally, proposing an office structure for this property also serves to limit the <br /> commercial uses on the south side of the highway to the TH 10/Silver Lake Road intersection. <br /> The Preferred Alternative reflects the potential for maximizing the area's tax base by identifying <br /> a site for an additional office building just to the east of TJB contractors, on a small pad of land <br /> immediately abutting the wetland. While it appears that adequate land area is available, it is not <br /> clear whether such a structure can satisfy required setbacks from both the TH 10 right-of-way <br /> and the wetland. This office structure would rely upon the TJB site for shared access and <br /> supporting parking. <br /> 111 <br /> Design <br /> The intent of incorporating urban design elements into the Section 9 redevelopment effort is to <br /> help unify the corridor while improving its image and enhancing its identity. Additionally, the <br /> introduction of elements of design strengthens subareas within Section 9 by reinforcing a sense <br /> of neighborhood, establishing a classic appeal and charm and carefully treating the transition or <br /> "edge" areas between adjacent land uses. <br /> With regard to the corridor as a whole (within and outside of Section 9), several design <br /> approaches can be implemented that, when combined, can achieve the goals and objectives of <br /> this plan. <br /> • Wetlands, woodlands and open space must be viewed as amenities within the corridor and, <br /> where possible, should be incorporated into site design as amenities to serve as unifying <br /> elements; <br /> • High quality architectural design must be a consideration for new or renovated structures <br /> along the corridor. Corridor identity is defined by an aggregate of images and impressions. <br /> As such, architecture, along with building setbacks, parking lot design and lighting and on- <br /> • <br /> site landscaping are important considerations in redeveloping the TH 10 corridor. <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.