My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-1997
MoundsView
>
City Commissions
>
Economic Development Commission
>
Packets
>
1994-1999
>
1997
>
07-24-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 12:42:26 PM
Creation date
8/1/2018 7:27:46 AM
Metadata
Fields
Template:
MV EDC
EDC Document Type
Packets
Date
7/24/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,00040„,A o Minnesota Department of Transportation <br /> :ff Metropolitan Division <br /> ��°""o�� Waters Edge <br /> 1500 West County Road B2 <br /> 1110 <br /> Roseville, MN 55113 <br /> June 26, 1997 <br /> Pamela Sheldon <br /> City of Mounds View <br /> 2401 Highway 10 <br /> Mounds View, MN 55112 <br /> Dear Pamela Sheldon: <br /> SUBJECT: MSP Real Estate, Inc. <br /> Site Plan Review S97-045 <br /> East of Trunk Highway (TH) 10, North of CSAH 3 <br /> Mounds View, Ramsey County <br /> C.S. 6204 <br /> The Minnesota Department of Transportation (Mn/DOT) has reviewed the MSP Real Estate, Inc. <br /> site plan. We find the plan acceptable for further development with consideration of the following <br /> 0 comments. <br /> • We require a permit for the relocation of the access to TH 10. We also require construction <br /> of a right turn lane on westbound TH 10 for permit approval. This development proposal <br /> necessitates the turn lane and is the responsibility of the project proposer, the city, or both. <br /> Enclosed is a diagram showing design specification for right turn lanes. In addition, the <br /> applicant must remove the existing access according to our specifications. <br /> The permit applicant must submit plan and cross-sectional drawings of the proposed access, <br /> showing the required turn lane. The new access should have 6:1 slopes or greater at the <br /> entrance. If a culvert is required, it should be installed beyond the clear zone. Please contact <br /> Lars Impola of our Permits Section at 582-1447 for further information and the appropriate <br /> forms. <br /> • We may require a Mn/DOT storm water drainage permit for the proposed development. <br /> Hydraulic computations and drainage area maps, showing before and after conditions and <br /> addressing 100-year storms, must be submitted for our review. Existing drainage patterns <br /> and rates of runoff affecting Mn/DOT right of way should be perpetuated. The site's storm <br /> water discharge rate must not increase. Any questions regarding Mn DOT's drainage <br /> concerns may be directed to Gene Bovy of our Water Resources Section at 779-5053. <br /> Questions regarding the permit process may be directed to Lars Impola of our Permits <br /> • Section. <br /> An equal opportunity employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.