Laserfiche WebLink
Medtronic Review <br />October 10, 2005 <br />Page 4 <br /> <br />Figure 2. Building Elevation <br /> <br /> <br /> <br /> <br />Traffic and Circulation <br /> <br />Medtronic is proposing a small round-about at the access to the parking ramp to help <br />coordinate and channel traffic to the site. A second larger round-about is planned at the <br />primary entrance to the facility with a small, separate pull out for child care pick-up and drop <br />off. The buildings will be encircled by a twenty-foot wide fire access road with a service spur <br />to the back of the building for service and deliveries. In this area as well there is another small <br />round-about to help govern the flow of traffic. The surface parking area will take access from <br />82nd Lane NE. The parking ramp will be accessed from Coral Sea Street with the service road <br />north and west of the ramp. <br /> <br />Offsite, many improvements are planned to coordinate traffic to and from the site and the local <br />and regional transportation systems. These improvements, articulated in Attachment A to this <br />report, will be completed by October of 2007 and ready by the time Phase 1 is completed and <br />ready for occupancy. The most important of the improvements involve the replacement of the <br />bridge over Interstate 35W. Currently at a two-lane width, the new bridge would allow for four <br />through lanes of traffic with additional space for turning lanes. The bridge would be long <br />enough to accommodate future expansions of 35W. The other significant improvement will be <br />the signalization of the Coral Sea Street and County Road J intersection. Coral Sea Street <br />south of County Road J to the site will be reconstructed and widened to four lanes of traffic <br />with a turning lane. The north leg of Coral Sea Street, currently offset from the south leg, will <br />be connected at the intersection as an additional enhancement. <br /> <br />