My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2005 CC
MoundsView
>
City Council
>
City Council
>
Packets
>
2000-2009
>
2005
>
10-10-2005 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 8:50:15 AM
Creation date
8/1/2018 12:35:33 PM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
10/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />County Road J Improvement Project <br />About the Project <br />Ramsey County, in cooperation with the <br />cities of Mounds View, Blaine, <br />Shoreview, Anoka County, and <br />Mn/DOT, along with its consultant, Short <br />Elliott Hendrickson Inc. (SEH), is <br />conducting roadway design work to <br />improve County Road J (85th Avenue <br />NE). The limits of this much needed <br />transportation project extend from <br />approximately Airport Road (93rd Lane <br />NE) on the west to Rice Creek <br />Parkway/Naples Street on the east. <br />The proposed improvements consist of: <br />z Widening County Road J to accommodate a continuous four-lane divided roadway with a raised center <br />concrete median <br />z Replacing the narrow two-lane bridge over I-35W with an expanded four-lane bridge with turn lanes <br />z Installing two additional traffic signals <br />z Adding left and right turn lanes at public street intersections <br />z Intersection improvements <br />z Modifications to driveways and access points <br />z Constructing a continuous pedestrian path along the roadway <br />Based on preliminary technical analysis completed by the project partners, a conceptual design for the proposed <br />roadway improvements was recommended (shown below). <br />Improvements are needed to increase both capacity and safety. The current two-lane bridge at I-35W and the <br />absence of turn lanes along County Road J cause congestion and traffic conflicts. The frequency and severity of <br />these problems will continue to grow as Medtronic office facilities and other planned commercial and residential <br />developments are completed. The proposed improvements will safely accommodate traffic volumes anticipated <br />at full build-out of properties served within the corridor. <br />The following graphic and paragraphs describe the recommended improvements in more detail: <br />Exhibit B
The URL can be used to link to this page
Your browser does not support the video tag.