Laserfiche WebLink
<br />Click to view larger view of this image <br />1. County Road J will be widened from approximately Airport Road (93rd Lane NE) on the west to Rice <br />Creek Parkway/Naples Street on the east to accommodate a continuous four-lane divided roadway with a <br />raised center concrete median. <br />2. The northbound I-35W exit ramp will be widened to accommodate additional turn lanes at the ramp <br />terminal. Furthermore, the existing temporary traffic signal will be replaced with a permanent full traffic <br />actuated control signal system. <br />3. The bridge over I-35W will be reconstructed and will be widened and lengthened to accommodate four <br />through lanes, left and right turn lanes and a pedestrian path. <br />4. The I-35W Service Road intersection will be improved to accommodate additional turn lanes at all <br />intersection approaches. Other improvements will include the construction of a raised median for the <br />northern and southern approaches and the replacement of the existing temporary traffic signal with a <br />permanent full traffic actuated signal control system with protected left turn phasing. <br />5. A pedestrian path will be constructed along County Road J throughout the entire project area. <br />6. The County Road J and Coral Sea St. intersection will be reconstructed into a single full access <br />intersection. The proposed intersection improvement will require a minor realignment of the northern <br />approach. Furthermore, a new full traffic actuated signal control system with protected left turn phasing <br />will be installed at the intersection. <br />7. A modified full traffic actuated signal control system will be installed at the County Road J and Xylite St. <br />intersection. <br />8. The existing four-lane undivided bridge over Highway 10 will remain in-place. <br />9. The County Road J and Airport Road (93rd Lane NE) intersection will be improved to accommodate <br />additional lanes and a pedestrian path. Modifications to the traffic signal will occur at the intersection. <br />10. The northbound and southbound lanes of Airport Road between County Road J and the south ramp <br />terminal will be widened to accommodate additional traffic lanes. <br />11. The eastbound Highway 10 exit ramp at Airport Road will be widened to accommodate a new right turn <br />lane. Furthermore, a new full traffic actuated signal control system will be installed at the ramp terminal <br />intersection. <br />12. A free-right turn lane to the access ramp onto westbound Highway 10 will be constructed on the <br />northbound lanes of Airport Road. <br />Previous Page <br /> Get Adobe Acrobat Reader <br /> <br />Exhibit B