My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2004/03/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2004
>
Agenda Packets - 2004/03/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:01 PM
Creation date
8/1/2018 2:27:31 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/22/2004
Supplemental fields
City Council Document Type
City Council Packets
Date
3/22/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No. 8G <br />Meeting Date: March 22, 2004 <br />Type of Business: CA <br />WK: Work Session; PH: Public Hearing; <br />CA: Consent Agenda; CB: Council Business <br />City Administrator Review _______ <br /> City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Greg Lee, Director of Public Works <br /> <br /> <br />Item Title/Subject: Resolution No. 6212 Authorizing the Preparation of a <br />Preliminary Feasibility Report and Consultant <br />Selection for the Silver Lake Road Sidewalk Project <br /> <br />Background: <br />The City’s Pathway Plan was discussed at the February 3, 2003 City Council <br />Work Session. In addition to the pathway along County Road H from Edgewood <br />Drive to the west City limits, the City Council identified four pathway segments <br />they would consider to be a priority. These were: <br /> <br />• Along the north side of County Road H2 - from County Road 10 to <br />Program Avenue. <br />• Along the east side of Edgewood Drive - from County Road H2 to <br />Edgewood Middle School. <br />• Along the north side of County Road 10 - adjacent to the wetland area <br />located just southeast of Walgreen’s store. <br />• Along the south side of County Road 10 – from Woodale Drive to the <br />south, connecting into the existing trail. <br /> <br />The two segments along County Road 10 were completed in the fall of 2003 as a <br />change order to the County Road H2 Project. <br /> <br />On January 5, 2004, Staff discussed the first two segments with the City Council. <br />Staff had investigated both sites. The Edgewood Drive Street segment consisted <br />of a right-of-way width of sixty feet (60’) with Edgewood Drive being forty-six feet <br />(46’) wide measured from back-of-curb to back-of-curb. This left only seven feet <br />(7’) of boulevard on each side. Given these conditions, along with the current <br />obstructions, Staff and the City Council concluded that installing a sidewalk and <br />allowing for adequate snow storage would be extremely problematic for both the <br />City and the adjacent residents without acquisition of additional right-of-way or <br />easements. For these reasons City Council directed the exclusion of Edgewood <br />Drive sidewalk from consideration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.