Laserfiche WebLink
2004 (Total Cost estimate -$34,633) <br />1. Paint and repair City Hall pavilions. ($1000) <br /> <br />2. Install new tables in the park pavilions at City Hall. (8 Tables, $7,000) <br /> <br />3. Install nets above backstop at Greenfield Park. ($2400) <br /> <br />4. Add more picnic tables at Hillview Park. Suggested during May 8, 2003 <br />park tour. B ($2,500) <br /> <br />5. Install grill by shelter at Hillview Park. ($300) <br /> <br />6. Resurface roller blade rink at Hillview Park. ($5,000-$7,000) <br /> <br />7. Add carpeting or some sort of floor covering at Lambert Park. Suggested <br />at the May 22nd meeting. B ($2,000) <br /> <br />8. Replace picnic tables at Oakwood Park. ($1 Table-$1,000) <br /> <br />9. Install chain-link fence on west end of field for soccer play at Oakwood <br />Park. ($500) <br /> <br />10. Replace doors on building at Random Park. ($600) <br /> <br />11. Install park bench at south end of playground at Random Park. ($600) <br /> <br />12. Crack seal parking lot at Silver View Park. ($1,520) (seal coat, <br />included@ $6,533.00) <br /> <br />13. Replace the two grills at Silver View Park. Suggested during May 8, 2003 <br />park tour. ($800) <br /> <br />14. Add picnic tables by the basketball court / parking lot area at Silver View <br />Park. Suggested during May 8, 2003 park tour. ($800) <br /> <br />15. Add picnic tables by the playground area at Silver View Park. Suggested <br />during May 8, 2003 park tour. ($800) <br /> <br />16. Replace doors on shelter at Silver View Park. ($800) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />