My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2004/04/12
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2004
>
Agenda Packets - 2004/04/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:25 PM
Creation date
8/1/2018 2:33:10 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/12/2004
Supplemental fields
City Council Document Type
City Council Packets
Date
4/12/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8. Repair/sealcoat trail in Greenfield Park. Park Foreman Recommendation. <br />B ($975.00) Pull: include in a pathway project <br /> <br />10. Take out black locust trees and replace with others at Groveland Park. <br />Park Foreman Recommendation. B (Done in 2003, $2000- Tree <br />Removal, $500-Stumps, See Steve for explanation) <br /> <br />36. Re-landscape islands at Silver View Park. Park Foreman <br />Recommendation. B ($500) <br /> <br />42. Perform a City wide survey B On the November 3, 2003 City Council <br />Work Session agenda to discuss <br /> <br />44. Silver View Path Pull: include in a pathway project <br /> <br /> <br /> <br />C. Long Term (add to Capital Improvement Program) <br />1. Irrigation System at City Hall – add an irrigation system to the south, east, and <br />west side for City Hall. Currently in CIP for 2005. C – 2005 <br /> <br />2. Edgewood Drive Boulevard Project – place colored concrete or brick pavers <br />between the curb and pathway on Edgewood Drive. Currently in CIP for <br />2006. C- 2006, possibly sooner <br /> <br /> <br />3. Playground replacement at City Hall. Park Foreman Recommendation. C- <br />2007 ($24,000-$25,000) (Fibarfill $6,000) <br /> <br />4. Community Center Parking Lot – redesign so the front ends of vehicles do not <br />overhang the sidewalk. There is a drainage problem that needs to be addressed <br />in front of the daycare. Add storm sewer catch basin and pipe it out to <br />Bronson Drive. Currently in CIP for 2007. C- 2007 <br /> <br />5. Tennis Courts of Greenfield Park – Clean up, crack seal surface, slurry coat, <br />add a gate to the fence for maintenance purposes. Suggested during May 8, <br />2003 park tour. C – 2010 <br /> <br />6. Look into developing a soccer field in the undeveloped area near Trunk <br />Highway 10 of Greenfield Park. Suggested during May 8, 2003 park tour. C – <br />2009 <br /> <br />7. Playground replacement of Greenfield Park. Park Foreman Recommendation. <br />C- 2010 ($50,000-$55,000 Fibarfill $8,000) <br /> <br />8. Repair/sealcoat parking lot of Greenfield Park. Park Foreman <br />Recommendation. C- 2011 ($2,500) <br />
The URL can be used to link to this page
Your browser does not support the video tag.