Laserfiche WebLink
9. Replace security light with more efficient fixtures at Greenfield Park. Park <br />Foreman Recommendation. C – 2006 <br /> <br />10. Park Building at Groveland Park – replace existing building. Currently in CIP <br />2004 design / 2005 construction C – 2004 <br /> <br />11. Playground replacement at Hillview Park. Park Foreman Recommendation. C <br />– 2008 ($26,000+$6,000) <br /> <br />12. Park Building at Lambert Park – replace existing building. Currently in CIP <br />2010 design / 2011 construction C – 2010 <br /> <br />13. Elevation on ballfield and repair drainage ditch at Lambert Park. Park <br />Foreman Recommendation. C – 2007 <br /> <br />14. Pave the pathway on the northwest corner of Hillview and Quincy at <br />Oakwood Park. Suggested during May 8, 2003 park tour. C – 2007 <br /> <br />15. Determine the feasibility of developing a small soccer field at the northwest <br />corner of Hillview and Quincy at Oakwood Park. Suggested during May 8, <br />2003 park tour. C – 2006 <br /> <br />16. Park Building at Random Park – replace existing building. Install ADA ramp <br />and railing Currently in CIP 2006 design / 2007 construction C- 2006 <br /> <br />17. Random Parking Lot – reconstruct the parking lot. Currently in CIP for 2008. <br />C – 2008 <br /> <br />18. Resurface parking lot at Silver View Park. Park Foreman Recommendation. <br />C – 2008 <br /> <br />19. Paved trail at Woodcrest Park. Park Foreman Recommendation. C – 2007 <br /> <br />20. Skate Park – develop a skate park within the City. Currently in CIP for 2004. <br />C – 2004 <br /> <br />21. Skate Park Expansion– expand existing skate park. Currently in CIP for 2006. <br />Assumes that a skate parks is constructed and successful. C – 2006 <br /> <br />22. Pathway Construction – construct a pathway along the north side of County <br />Road H from Edgewood Drive to west City limits. C- 2003 <br /> <br />23. Pathway Construction – construct a pathway along the south side County <br />Road 10 from where the existing pathway terminates by the Mermaid to <br />Woodale Drive. C – 2003 <br /> <br />24. Pathway Rehabilitation – re-construct and raise the elevation of the pathway <br />along the north side that is adjacent to the wetland to the south east of