My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2004/06/28 (2)
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2004
>
Agenda Packets - 2004/06/28 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:42 PM
Creation date
8/1/2018 4:34:48 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/28/2004
Supplemental fields
City Council Document Type
City Council Packets
Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No. 9I <br />Meeting Date: June 28, 2004 <br />Type of Business: CA <br />WK: Work Session; PH: Public Hearing; <br />CA: Consent Agenda; CB: Council Business <br />City Administrator Review _______ <br /> City of Mounds View Staff Report <br /> <br />To: Honorable Mayor and City Council <br />From: Greg Lee, Director of Public Works <br /> <br />Item Title/Subject: Resolution 6291 Awarding a Contract for the Saw <br />and Seal associated with the County Road H2 Street <br />Improvement Project <br /> <br />Background: <br />As a technique to maximize the investment and increase the longevity of a new <br />bituminous pavement, i.e. roadway surface, expansion joints are commonly <br />added. Expansion joints created by sawing a joint into the pavement at selected <br />locations – typically every 40 to 60 feet. These joints are then sealed with a <br />rubberized compound. The purpose of adding joints is to allow for the expansion <br />and contraction of the paved surface. Without them, the pavement will crack on <br />its own, leaving areas where moisture / frost can accelerate deterioration of the <br />roadway. This technology has been studied by Mn/DOT for years, and with its <br />minimal expense, has proven to be cost effective as part of the construction of <br />new streets. <br /> <br /> <br />Discussion: <br />Expansion joints were to have been included in the plans and specifications for <br />the County Road H2 Street Improvement Project. However, as an over sight, the <br />consultant did not include this item in as a bid item. <br /> <br />Adding it in as a Change Order is not recommended. Since this is a specialty <br />item, the general contractor will sub contract this out and add a percentage onto <br />the bill. It is therefore advantageous for the City to seek bids and directly contract <br />for this work. <br /> <br />Bids for sawing and sealing the County Road H2 Street Improvement Project <br />were sought. However, there was only one bidder. See attached letter from Barry <br />Peters of SEH. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.