My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2003/12/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2000-2009
>
2003
>
Agenda Packets - 2003/12/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:35 PM
Creation date
8/8/2018 11:42:37 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/8/2003
Supplemental fields
City Council Document Type
City Council Packets
Date
12/8/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> <br />Staff will be meeting with SEH on December 23, 2003 to discuss details of developing a list. Prior <br />to then, representatives of SEH will be visiting City Hall to review a few electrical details. It is <br />anticipated that the draft list/report will be submitted to the City in early January, 2004. <br /> <br />The report, when finished, will be used to assist the City in planning for future improvements to <br />the building as well as point out any existing deficiencies that will need immediate attention. <br /> <br /> <br />COUNTY ROAD H PATHWAY – FROM EDGEWOOD DRIVE TO THE WEST CITY LIMITS <br />On October 27, 2003, the City Council approved Resolution No. 6118 rejecting all current bids, <br />authorizing Staff to re-advertise for bids, and establish a new bid date for the County Road H <br />Sidewalk Project. A bid date of January 8, 2004 was established. The City will be receiving bids <br />for two segments: From Silver Lake Road to the West City Limits and from Silver Lake Road to <br />Knollwood Drive. These were set up as two completely separate bids. The City Council will have <br />the option of awarding the contract for either bid or rejecting the bids and not awarding a contract. <br /> <br />Information pertaining to the County Road H sidewalk status will be included in the <br />January/February issue of the Mounds View Matters. Staff anticipates presenting this to the City <br />Council for action on January 26, 2004. <br /> <br /> <br />PATHWAY PROJECT – ADDITIONAL SEGMENTS FOR CONSIDERATION <br />The City’s Pathway Plan was discussed at the February 3, 2003 City Council Work Session. In <br />addition to the pathway along County Road H from Edgewood Drive to the west City limits, the <br />City Council identified four pathway segments they would consider to be a priority. These were: <br /> <br />• Along the north side of County Road H2 - from County Road 10 to Program Avenue. <br />• Along the east side of Edgewood Drive - from County Road H2 to Edgewood Middle <br />School. <br />• Along the north side of County Road 10 - adjacent to the wetland area located just <br />southeast of Walgreen’s store. <br />• Along the south side of County Road 10 – from Woodale Drive to the south, connecting <br />into the existing trail. <br /> <br />The two segments along County Road 10 were completed in the fall of 2003 as a change order to <br />the County Road H2 Project. <br /> <br />Staff would like to discuss the first two segments with the City Council. Staff has investigated both <br />sites and found that the roadway segments were excessive in width. This, coupled with the <br />narrow boulevards and current obstructions, would make the installation of a sidewalk or pathway <br />in these areas problematic for both the City and the adjacent residents. <br /> <br />Staff is recommending that the City install pedestrian walkways along these segments at the time <br />the streets are scheduled for major maintenance. This would allow for the option of changing one <br />or both curblines to accommodate a pathway. This would provide the best long-term solution for <br />the City and the people who use and live along these street segments. <br /> <br />In lieu of constructing these two segments, Staff is presenting the option of pursuing the <br />construction of a pathway along Silver Lake Road from County Road H to County Road 10. The <br />County has scheduled a mill and overlay for this segment of Silver Lake Road in 2004. Although <br />the County project will not involve or disturb the boulevard areas, it still would be advantageous to <br />coordinate a new sidewalk/pathway with the repaving of the street. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.