Laserfiche WebLink
Mounds View Planning Commission November 20, 2002 <br />Regular Meeting Page 2 <br />________________________________________________________________________ <br /> <br />4. Citizens Requests and Comments on Items Not on the Agenda <br /> <br />None. <br />__________________________________________________________________________ <br /> <br />5. Planning Case DE01-005 <br /> <br />Community Development Director Ericson indicated that Edgewood Middle School was before <br />the Commission seeking approval of a development review for the previously approved <br />expansion due to changes in the approved plan. He then indicated that the school had been <br />required to scale back the expansion due to budget constraints. <br /> <br />Director Ericson indicated the three areas of expansion focus mainly on the entry way and front <br />of the building. He then indicated that Staff had reviewed the request and all the setbacks and <br />parking requirements are met with the plan. <br /> <br />Director Ericson indicated Staff had provided a resolution recommending approval and said the <br />representatives from ATS&R were present to answer any questions the Commission may have. <br /> <br />Ms. Peltsman, ATS&R, provided color drawings of the proposed expansion. She then reviewed <br />what was previously approved and compared it to the current request. <br /> <br />Ms. Peltsman indicated the expansion of the front of the building would be built tall enough to <br />screen the mechanicals from view as well as acoustically. <br /> <br />Ms. Peltsman provided a drawing and explanation of the outside elevation of the building. She <br />then indicated there would be a new media center but the industrial technology area and cafeteria <br />had been eliminated from the plan and incorporated into the existing space. The rest of the <br />expansion is to be used for administration. <br /> <br />Commissioner Miller said she thought Ms. Peltsman provided a good presentation but asked for <br />clarification on the original plan because it had specified two classrooms, a media center, an <br />industrial technology area as well as a cafeteria. She then asked if any of those were <br />incorporated into the new expansion. <br /> <br />Ms. Peltsman explained that the district functions had moved out of the building so that <br />industrial technology could utilize that space. She then indicated that the school had <br />reconfigured and consolidated spaces in order to accommodate all of the proposed changes <br />within the existing space. She further explained that the cafeteria is being improved rather than <br />reconstructed by adding large widows, a finished ceiling and new lighting. <br /> <br />Director Ericson indicated the resolution should state that the expansion is approximately 12,000 <br />square feet. He then explained there are three stipulations attached to the resolution. The first is <br />a Rice Creek Watershed District permit, the second is that all disturbed pervious areas be