Laserfiche WebLink
4 <br /> ORDINANCE NO. 654 <br /> <br /> CITY OF MOUNDS VIEW <br /> COUNTY OF RAMSEY <br /> STATE OF MINNESOTA <br /> <br /> <br />AN ORDINANCE AMENDING CHAPTER 202, SECTION 202.09 OF THE MOUNDS <br />VIEW MUNICIPAL CODE ENTITLED "PUBLIC IMPROVEMENTS" <br /> <br /> The City of Mounds View ordains: <br /> <br />SECTION I Chapter 202.09,Subd 2 of the Mounds View Municipal Code is <br />amended to read: <br /> The following are methods of street reconstruction and rehabilitation, which will be utilized by the City of Mounds View in considering future projects and assessments. It will be noted that the design standard for either reconstruction or rehab will be the current design of the street section. Projects may be constructed to higher designs if warranted and / or approved by the City Council. <br /> <br />Subd.2 Improvement Type and Apportionment of Cost: <br /> <br />a. Street Reconstruction Including Curb and Gutter. The cost of street <br />reconstruction shall be recovered by the adjusted front footage method. The <br />front footage rate shall be determined by dividing the project cost by the total <br />number of adjusted front feet in the project area. The assessments per <br />adjusted front foot may vary depending on the underlying zoning of a parcel. <br />Assessments for residential properties which are on collector or arterial <br />streets, (MSA, County road) shall be assessed for one hundred (100%) of the <br />pavement surface and base, up to a width of 26 feet, equally divided by both <br />sides of the street. This amount shall not exceed $14.60 per front foot. <br />b. a.1. Non-Collector Street Residential property owners will be assessed for the cost of the pavement and base for the front footage side of the property, which shall not exceed $14.60 per frontage foot. This amount will be adjusted annually by resolution, in accordance with the Engineering News Record (ENR) <br /> a.2. Residents requesting Curb and Gutter, any required storm sewer and/or installation of sidewalks/trails on a construction project will be assessed twenty-five (25%)