Laserfiche WebLink
12: Groveland & access 06/07/2017 <br />T:\2306\12\synchro\with signals\2020 am b.syn Synchro 9 Report <br />Intersection <br />Int Delay, s/veh 1.4 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations 1> 0 0 <1 1> 0 <br />Traffic Vol, veh/h 4 21 5 26 131 1 <br />Future Vol, veh/h 4 21 5 26 131 1 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - None - None - None <br />Storage Length 0 - - - - - <br />Veh in Median Storage, # 0 - - 0 0 - <br />Grade, % 0 - - 0 0 - <br />Peak Hour Factor 92 92 92 92 92 92 <br />Heavy Vehicles, % 2 2 2 2 2 2 <br />Mvmt Flow 4 23 5 28 142 1 <br /> <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 182 143 143 0 - 0 <br /> Stage 1 143 - - - - - <br /> Stage 2 39 - - - - - <br />Critical Hdwy 7.12 6.22 4.12 - - - <br />Critical Hdwy Stg 1 6.12 - - - - - <br />Critical Hdwy Stg 2 6.12 - - - - - <br />Follow-up Hdwy 3.518 3.318 2.218 - - - <br />Pot Cap-1 Maneuver 779 905 1440 - - - <br /> Stage 1 860 - - - - - <br /> Stage 2 976 - - - - - <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 777 905 1440 - - - <br />Mov Cap-2 Maneuver 777 - - - - - <br /> Stage 1 857 - - - - - <br /> Stage 2 972 - - - - - <br /> <br />Approach EB NB SB <br />HCM Control Delay, s 9.2 1.2 0 <br />HCM LOS A <br /> <br />Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR <br />Capacity (veh/h) 1440 - 882 - - <br />HCM Lane V/C Ratio 0.004 - 0.031 - - <br />HCM Control Delay (s) 7.5 0 9.2 - - <br />HCM Lane LOS A A A - - <br />HCM 95th %tile Q(veh) 0 - 0.1 - -