Laserfiche WebLink
12: Groveland & access 06/29/2017 <br />T:\2306\12\synchro\with signals\2020 pm b.syn Synchro 9 Report <br />Intersection <br />Int Delay, s/veh 1.6 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations 1> 0 0 <1 1> 0 <br />Traffic Vol, veh/h 2 11 21 78 58 3 <br />Future Vol, veh/h 2 11 21 78 58 3 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - None - None - None <br />Storage Length 0 - - - - - <br />Veh in Median Storage, # 0 - - 0 0 - <br />Grade, % 0 - - 0 0 - <br />Peak Hour Factor 98 98 98 98 98 98 <br />Heavy Vehicles, % 2 2 2 2 2 2 <br />Mvmt Flow 2 11 21 80 59 3 <br /> <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 183 61 62 0 - 0 <br /> Stage 1 61 - - - - - <br /> Stage 2 122 - - - - - <br />Critical Hdwy 6.42 6.22 4.12 - - - <br />Critical Hdwy Stg 1 5.42 - - - - - <br />Critical Hdwy Stg 2 5.42 - - - - - <br />Follow-up Hdwy 3.518 3.318 2.218 - - - <br />Pot Cap-1 Maneuver 806 1004 1541 - - - <br /> Stage 1 962 - - - - - <br /> Stage 2 903 - - - - - <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 795 1004 1541 - - - <br />Mov Cap-2 Maneuver 795 - - - - - <br /> Stage 1 962 - - - - - <br /> Stage 2 890 - - - - - <br /> <br />Approach EB NB SB <br />HCM Control Delay, s 8.8 1.6 0 <br />HCM LOS A <br /> <br />Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR <br />Capacity (veh/h) 1541 - 965 - - <br />HCM Lane V/C Ratio 0.014 - 0.014 - - <br />HCM Control Delay (s) 7.4 0 8.8 - - <br />HCM Lane LOS A A A - - <br />HCM 95th %tile Q(veh) 0 - 0 - -