Laserfiche WebLink
Mounds View Planning Commission November 16, 2016 <br />Regular Meeting Page 2 <br />________________________________________________________________________ <br /> <br /> <br /> <br />5. Planning Cases <br /> <br />A. Resolution 1060-16, Consideration of a Recommendation for approval of a <br />Development Review of the Public Works Facility expansion for property at <br />2466 Bronson Drive (Planning Case MU2016-003). <br /> <br />Planner Sevald stated the City will be replacing its Public Works Facility in 2017 at the location <br />of the current facility at 2466 Bronson Drive. A Development Review is required of the Site Plan <br />(e.g. parking, landscaping, lighting, etc.). The proposed facility will require a Variance to reduce <br />the front yard setback for a parking lot; a Conditional Use Permit for outside storage; and a <br />Conditional Use Permit for above ground fuel tanks. <br /> <br />Planner Sevald reported the Public Works Facility is located along Bronson Drive on the north <br />side of City Hall Park. The maintenance building was constructed in the mid-1960’s, and an <br />addition was built in 1987. Originally used by the Police Department, Public Works moved in <br />when the current City Hall and Police Department were built. The existing Public Works facility <br />includes a number of buildings. Only the Maintenance building (12,256 sq. ft. existing), Cold <br />Storage/Salt Storage building (4,800 sq. ft. existing) will be replaced. The new Maintenance <br />Building will be 34,773 sq. ft., and the Salt Storage Shed will be 1,600 sq. ft. The new facility <br />will be constructed in phases, allowing continued operation of the existing facility during <br />construction. The parking requirements for the new facility was reviewed in detail. Staff <br />provided further comment on the Development Review and recommended approval. <br /> <br />Chair Stevenson asked for comment from Public Works Director Erickson on the new Public <br />Works facility. <br /> <br />Public Works Director Erickson thanked the Commission for their time and thanked Planner <br />Sevald for his thorough staff report. He reviewed pictures from inside the current Public Works <br />Facility to note its cramped condition. Photographs of items being stored outdoors was <br />commented on, along with the location of the existing fuel tank. He then discussed the new <br />facility that would be constructed. Staff anticipated construction would take 14 to 16 months to <br />complete. <br /> <br />Commissioner Love questioned if the new facility would have a sidewalk. Public Works <br />Director Erickson reported no sidewalk was being proposed, but the trail would remain in place. <br /> <br />Commissioner Love requested further comment on the landscaping plan. Public Works Director <br />Erickson reviewed the landscaping plan in further detail. <br /> <br />Commissioner Love inquired if the Public Works Facility office would be open to the public. <br />Public Works Director Erickson indicated this would be a public office. <br />