My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-05-2005
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
2000-2009
>
2005
>
10-05-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 6:04:21 AM
Creation date
9/4/2018 6:04:08 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
10/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Medtronic Review <br />October 5, 2005 <br />Page 2 <br /> <br />Discussion: <br /> <br />Opus Architects & Engineers have submitted the detailed site plans, surveys and preliminary <br />plat for this second stage of the PUD process. The plans, date-stamped September 9, 2005, <br />include the following plan sheets: <br /> <br />1. S1 PUD Site Plan <br />2. C2 Existing Conditions <br />3. C3 Grading, Drainage and Erosion Control (SW Quad) <br />4. C4 Grading, Drainage and Erosion Control (SE Quad) <br />5. C5 Grading, Drainage and Erosion Control (NW Quad) <br />6. C6 Utility Plan (SW Quad) <br />7. C7 Utility Plan (SE Quad) <br />8. C8 Utility Plan (NW Quad) <br />9. C9 Stormwater Pollution Protection Plan (SWPPP) <br />10. C10 SWPPP Details <br />11. C11 Site Details <br />12. C12 Additional Site details <br />13. C13 Wetland Mitigation Plan <br />14. A2.01 Master Floor Plan – Level 1 <br />15. A2.02 Master Floor Plan – Level 2 and above <br />16. A3.0 Elevation Sheet <br />17. A3.1 Perspective Sheet <br />18. Topographic Survey – Blaine Land <br />19-21. Golf Course Boundary and Topographic Survey <br />22. Medtronic CRM Preliminary Plat <br /> <br />In addition to these full-size plan sheets, the Commission has been provided with 11 x 17 <br />reduced color versions of Sheets A3.0 and A3.1, the Elevation and Perspective Sheets, as <br />well as the site plan. <br /> <br />What has changed? <br /> <br />In addition to the extra detail and scope of the plan submittal, a few minor revisions and <br />changes have been made to the plans presented to the Planning Commission on July 20 and <br />August 3. While the changes are not insignificant, they reflect only modifications to the <br />design and layout of the structures rather than bulk and height. As the Commission may <br />recall, the original concept plan identified four distinct buildings in a pin-wheel orientation tied <br />together by a two-story atrium-like commons area. While there remains four distinct eight- <br />story buildings, these are now all oriented in an east-west fashion to enhance environmental <br />sustainability. The first two phases would be linked together by stacked corridors and <br />meeting rooms 60 feet wide except at the main level where the connective space is 180 feet <br />wide. The first phase would be connected to the parking ramp north of the buildings at the <br />ground level, where the daycare and service areas would be located. The parking plan <br />remains the same, in that Phase 1 would include a three-story structured ramp to the north <br />and the 900 surface stalls near the building entrance. Phase 2 would involve two more floors <br />added to the north ramp and Phase 3 would involve a ramp in the City of Blaine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.