Laserfiche WebLink
Mounds View City Council August 23, 1999 <br />Regular Meeting Page 26 <br />Council Member Marty commented he had driven by the wetland with his two sons, and thought the <br />area was beautiful. <br />D. Public Hearing Amending Chapter 202 of the Mounds View Municipal Code <br />Entitled "Public Improvements." <br />Mayor Coughlin opened the Public Hearing at 9.05 p.m. <br />Director of Public Works Ulrich stated this item was in consideration of amending Chapter 202 of <br />the Municipal Code, pursuant to the recommendations provided by the Streets Policies Committee. <br />He stated staff had provided a report at the last Council meeting, which briefly outlined the possible <br />proposed changes in this chapter, which pertains to assessments. He stated staff has included the <br />proposed changes to the draft ordinance, as indicated in bold print. He stated that blank spaces have <br />been inserted for the percentages of street improvements, to include total reconstruction, overlays, <br />mill and overlays and recycle and overlays. He stated that verbiage has also been included relating <br />to the percentage of pavement assessed, percentage of curb and gutter assessed, the percentage of <br />an MSA street project assessed, as well as language regarding the assessment of improvements <br />performed on a County or State Highways. He read the proposed changes to Section 1, Subdivision <br />2 of the ordinance as follows: <br />a. The cost of street reconstruction shall be recovered by the adjusted front footage <br />method. The front footage rate shall be determined by dividing the project cost by <br />the total number of adjusted front feet in the project area, times the individual <br />adjusted front footage xone-half (~/z). The assessments per adjusted front foot may <br />vary depending on the underlying zoning of a parcel. Assessments for residential <br />properties, which are on collector or arterial streets, (MSA) shall be assessed for <br />percent of the pavement surface equally divided by both sides of the street. <br />a.l. Residents requesting Curb and Gutter installation on a construction project will <br />be assessed percent of the total cost of the Curb and Gutter, which will <br />include engineering, additional removals, base and all other associated expenses. <br />a.2. percent of the turn back funds received from Ramsey County will be <br />applied to the new construction or pavement cost of the road that was received. <br />b. Assessments shall be determined by the adjusted front footage method at <br />percent to properties on both sides of the street. A mill and overlay to an <br />existing paved road will be assessed by the adjusted front footage method at <br />percent, to properties on both sides of the street. A recycle and overlay <br />to an existing paved road will be assessed by the adjusted front footage method <br />at -percent to properties on both sides of the street. <br />26C:~ADMIN\MINUTES\CC\8-23-99.CC <br />