Laserfiche WebLink
Holiday Call -Out Rate, Specified Time Conducted <br />on Holidays <br />$150 per hour specified <br />Right -Of -Way Management Fees (Chapter 910) Additional Fees May be Required for Legal and <br />Engineering Costs Incurred by the City) <br />Excavation, Hole Fees, Boulevard Areas <br />$100 per hole <br />Excavation, Hole Fees, Pavement Areas <br />$200 per hole <br />Excavation, Underground Utility Work, Open <br />Trenching - Boulevard Areas Open <br />$50 per 100 lineal feet or fraction thereof (requires <br />hole fee) <br />Excavation, Underground Utility Work, Open <br />Trenching - Pavement Areas <br />$70 per 100 lineal feet or fraction thereof (requires <br />hole fee) <br />Excavation, Trenchless Installation <br />$35 per 100 lineal feet or fraction thereof <br />Excavation, Overhead Installation <br />$25 per 100 lineal feet or fraction thereof <br />Obstruction, New Pavement <br />$100 per obstruction <br />Obstruction, Replace Existing Obstruction (in-kind) <br />$50 per obstruction <br />Temporary Obstruction, Dumpster, Portable <br />Restroom, etc. <br />$25 per obstruction <br />Temporary Obstruction, Equipment Used for <br />Excavation <br />No Charge <br />Miscellaneous ROW Management Fees and Costs (Discount for Work Done Pertaining to City Project; <br />Additional Fees May be Required for Legal and Engineering Costs Incurred by the City) <br />Street Opening Permit Re uires Deposit 1200 <br />Street 012ening Deposit To be determined by the Director of Public Works <br />Registration Fee (ROW Users and Registrants) $30 <br />Permit Extension $30 <br />Delay Penalty 10% of ROW Permit <br />Fee Calculated at time of permit <br />-Degradation <br />Restoration Cost Calculated at time of permit <br />Overhead Utility Line Repair No Charge <br />Street Curb Alteration $50 <br />Temporary Access $25 per access <br />Penalty for Work Done without a Permit Double Fee 50% <br />Municipal Water System Fees (Chapter 906) <br />Water Availability Charge WAC), Residential <br />$500 per unit <br />WAC Charge, Commercial/Industrial <br />$1,000 per acre of developable land ($1,000 <br />minimum charge) <br />Residential Water Usage Base Charge <br />$42-.-00 16.00 per quarter <br />Residential Water - 0 to12,000 gallons <br />$2-.2-0 2.30 per 1,000 gallons per quarter <br />Residential Water - 12,000 to 24,000 gallons <br />$2-.42 2.53 per 1,000 gallons per quarter <br />Residential Water - Over 24,000 gallons <br />$2-.79-2.91 per 1,000 gallons per quarter <br />Commercial Water Usage Base Charge <br />$4-2-.00 16.00 per quarter <br />Commercial Water - 0 to 125,000 gallons <br />$2-.2-0 2.30 per 1,000 gallons per quarter <br />Commercial Water - 125,000 to 700,000 gallons <br />$2-.42 2.53 per 1,000 gallons per quarter <br />Commercial Water - 700,001 to 1,100,000 gallons <br />$2-.66 2.78 per 1,000 gallons per quarter <br />Commercial Water - Over 1,100,000 gallons <br />$3-.06 3.20 per 1,000 gallons per quarter <br />Water Quality Testing Charge <br />$1.59 per connection per quarter <br />Water Service Line Repair Insurance Charge <br />$7.50 per connection per quarter <br />Meter Read Program Penalty (Failure to participate <br />or grant access for installation or repair) <br />$100 150 per connection per quarter <br />Utility Bill Late Payment <br />10% of delinquent bill amount <br />Utility Bill Assessment Search <br />$10 <br />Water Service Connection/Repair, Size Less than 4 <br />Inches (Right -Of -Way Permit Needed if Excavation <br />Occurs in Public Rights -Of -Way) <br />$100 plus surcharge <br />2019 Mounds View Fee Schedule Page 10 of 12 <br />