Laserfiche WebLink
Water Service Connection/Repair, Size Over 4 <br />Inches (Right -Of -Way Permit Needed if Excavation <br />Occurs in Public Rights -Of -Way) <br />Water Service Inspection <br />Water Service Re -Inspection <br />Manual Water Meter Read <br />Hydrant Meter Deposit <br />Hydrant Meter Rental (One Week Minimum) <br />Water Shut-Off/Turn-On <br />Water Shut-Off/Turn-On (Snowbirds) <br />Water Meter Testing <br />Water Testing <br />Water Meter (Residential Only) <br />Water Meter Radio Remote Reading Device <br />Curb Stop — Valve Cover <br />Municipal Sanitary Sewer System Fees (Cha <br />Sewer Service Availability Charge (SAC) <br />Sewer Usage Rate <br />Sewer Usage Rate <br />Sewer Service Charge, Residential <br />Sewer Service Charge, Commercial/Industrial/ <br />Public Buildings and Churches <br />Sewer Connection/Repair (Right -Of -Way Permit <br />Needed if Excavation Occurs in Public Rights -Of - <br />Way) <br />Sewer Unit Charge (New Connection Only) <br />Sewer Inspection <br />$150 plus surcharge <br />No charge during normal business hours, otherwise <br />one hour at call -out rate per visit <br />One hour at call -out rate per visit <br />One hour at call -out rate per visit <br />$2,500 <br />$50 per week <br />$150 per month <br />No charge during normal business hours, otherwise <br />one hour at call -out rate per visit <br />$25 per shut —off <br />$25 per turn -on <br />One hour at call -out rate <br />One hour at call -out rate <br />City cost plus 10% administrative fee <br />City cost plus 10% administrative fee <br />City cost plus 10% administrative fee <br />ter 907) <br />$2,485 per Metropolitan Council Environmental <br />Services <br />Per Quarter <br />$2-.7-7 2.91 per 1,000 gallons water sold per quarter <br />$34-76 36.50 per residential equivalent unit (REU) <br />connection per quarter <br />$36-33 89.65 per REU Connection per quarter <br />Sewer Re -Inspection <br />Surface Water Management (SWM) Utility Fees <br />SWM New Construction, R-1 <br />SWM New Construction, R-2 <br />SWM New Construction, R-3, R-4, R -O <br />SWM New Construction, B-1, B-2, B-3, B-4 <br />SWM New Construction, 1-1, PUD <br />SWM Utility Rate Charge, R-1 Single Family and R- <br />2 Single and Two Family Residential <br />SWM Utility Rate Charge, R-3 Medium Density <br />Residential <br />SWM Utility Rate Charge,R-4 High Density <br />Residential, R-5 Mobile Homes and R -O Residential <br />Office <br />SWM Utility Rate Charge,B-1 Neighborhood <br />Business, B-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />SWM Utility Rate Charge, 1-1 Industrial <br />SWM Utility Rate Charge, PUD Planned Unit <br />Development <br />$100 plus surcharge <br />$150 per connection <br />No charge if during normal business hours, otherwise <br />one hour at call -out rate per visit <br />One hour at call -out rate per visit <br />(Chaster 908) <br />$212 per lot <br />$1,038 per acre <br />$1,500 per acre <br />$1,500 per acre <br />$2,096 per acre <br />$11-90 12.00 per unit per quarter <br />$60.4 65.61 per acre per quarter <br />$71.32 77.81 per acre per quarter <br />$9342 101.92 per acre per quarter <br />$72L.43 79.57 per acre per quarter <br />$82.71 90.24 per acre per quarter <br />2019 Mounds View Fee Schedule Page 11 of 12 <br />