My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2019/04/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2019
>
Agenda Packets - 2019/04/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:10 PM
Creation date
5/3/2019 3:50:30 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/8/2019
Supplemental fields
City Council Document Type
City Council Packets
Date
4/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the rehabilitation of the parking lot at Fire Station #1 located at 1710 County Highway 10 <br />in Spring Lake Park at this time. <br />Stantec and American Engineering and Testing have provided fee estimates to provide <br />engineering services for the construction phase of this project. Those services include <br />administration, engineering, inspection, surveying, material testing and close out for this <br />project. Compensation will be based on the actual hour's required plus reimbursable <br />expenses for a maximum estimated fee from Stantec of $16,831.00, and an estimated <br />fee from American Engineering and Testing of $9,106.00. <br />Strategic Plan Strategy/Goal: Maintain and Plan for Infrastructure Improvements. <br />Financial Impact: 2019 CIP-budgeted estimate of $800,000 for Woodale Drive and <br />$100,000 for the Silver View Park parking lot was placed in the budget. No additional <br />transfer of funds is necessary. <br />Recommendation: <br />Staff recommends the City Council adopt the attached resolution authorizing the award <br />of a construction contract to North Valley Inc. of Nowthen, MN in the amount $558,321.24, <br />for the 2019 Street and Parking Lot improvement program, City Project (2018-004). Staff <br />also recommends the City Council approve a contingency of 17% or $94,941, for any <br />unforeseen issues that arise during this construction project. Staff further recommends <br />the council approve Stantec to perform inspection services at a proposed cost of <br />$16,831.00 and for American Engineering and Testing to perform material testing at a <br />cost of $9,106.00. The total cost of the project of a not to exceed amount of $593,699.24. <br />Respectfully submitted, <br />Don Peterson <br />Public Works Director <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.